You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ambari.apache.org by "Hadoop QA (JIRA)" <ji...@apache.org> on 2016/03/21 17:00:26 UTC
[jira] [Commented] (AMBARI-15482) Restarting HDFS Before Upgrade
Finalizing Does Not Supply the rollingUpgrade Flag
[ https://issues.apache.org/jira/browse/AMBARI-15482?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15204500#comment-15204500 ]
Hadoop QA commented on AMBARI-15482:
------------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest attachment
http://issues.apache.org/jira/secure/attachment/12794523/AMBARI-15482.patch
against trunk revision .
{color:red}-1 patch{color}. Top-level trunk compilation may be broken.
Console output: https://builds.apache.org/job/Ambari-trunk-test-patch/5951//console
This message is automatically generated.
> Restarting HDFS Before Upgrade Finalizing Does Not Supply the rollingUpgrade Flag
> ----------------------------------------------------------------------------------
>
> Key: AMBARI-15482
> URL: https://issues.apache.org/jira/browse/AMBARI-15482
> Project: Ambari
> Issue Type: Bug
> Components: ambari-server
> Affects Versions: 2.0.0
> Reporter: Jonathan Hurley
> Assignee: Jonathan Hurley
> Priority: Critical
> Fix For: 2.2.2
>
> Attachments: AMBARI-15482.patch
>
>
> During an upgrade, the HDFS NameNode(s) are restarted with the {{-rollingUpgrade}} flag. However, it's possible to get to the end of an upgrade and decide to "Finalize Later".
> This allows the cluster to run in the upgraded state before committing to the upgrade. Full cluster control is returned via the Ambari web client.
> Administrators can then decide to restart a NameNode. Upon restarting the NameNode, it will produce an error that it was not started with the {{rollingUpgrade}} flag.
> It seems that as long as an upgrade has not been finalized, the NameNode(s) must be started with the {{rollingUpgrade}} to allow them to function properly.
> STR:
> - Perform a rolling upgrade from HDP 2.2 to 2.3 (or 2.3 to 2.4); as long as there is a major version change.
> - Before finalization, say "Finalize Later". All services should be up and green.
> - Now restart a NameNode
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)