You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "asolomon (Jira)" <ji...@apache.org> on 2025/07/19 20:07:00 UTC
[jira] [Work started] (HBASE-29459) Update incremental backup to capture bulkload files only till IncrCommittedWalTs
[ https://issues.apache.org/jira/browse/HBASE-29459?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Work on HBASE-29459 started by asolomon.
----------------------------------------
> Update incremental backup to capture bulkload files only till IncrCommittedWalTs
> --------------------------------------------------------------------------------
>
> Key: HBASE-29459
> URL: https://issues.apache.org/jira/browse/HBASE-29459
> Project: HBase
> Issue Type: Task
> Components: backup&restore
> Reporter: asolomon
> Assignee: asolomon
> Priority: Major
>
> In incremental backup, we copy bulkload files to backup location. We introduced IncrCommittedWalTs field for incremental backup and this needs to be used in copy bulkload code so only bulkload operation till IncrCommittedWalTs timestamp are copied
--
This message was sent by Atlassian Jira
(v8.20.10#820010)