You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@continuum.apache.org by Vi...@logitech.com on 2007/03/03 00:03:07 UTC
Forcing continuum scheduled builds even there is no change in source
control
Hi All,
Due to our source structure, I have to svn checkout/update many separate
folders to do build. Thus continuum checkout/update an ant scripts and that
ant script will checkout different folders and do the build. My problem is
continuum is skipping the builds since there is no change in the ant script
most of the time.
Is there any way I can instruct continuum to perform scheduled builds even
there is no code change in source control.
Thanks,
~nakees
Re: Forcing continuum scheduled builds even there is no change in
source control
Posted by Martin Gilday <ma...@imap.cc>.
You will be able to in the next release, but not easily in 1.0.3.
----- Original message -----
From: Vivek_Nakeesan@logitech.com
To: continuum-dev@maven.apache.org
Date: Fri, 2 Mar 2007 18:03:07 -0500
Subject: Forcing continuum scheduled builds even there is no change in
source control
Hi All,
Due to our source structure, I have to svn checkout/update many separate
folders to do build. Thus continuum checkout/update an ant scripts and
that
ant script will checkout different folders and do the build. My problem
is
continuum is skipping the builds since there is no change in the ant
script
most of the time.
Is there any way I can instruct continuum to perform scheduled builds
even
there is no code change in source control.
Thanks,
~nakees