You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Hadoop QA (JIRA)" <ji...@apache.org> on 2015/01/21 10:01:35 UTC

[jira] [Commented] (YARN-3057) Need update apps' runnability when reloading allocation files for FairScheduler

    [ https://issues.apache.org/jira/browse/YARN-3057?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14285376#comment-14285376 ] 

Hadoop QA commented on YARN-3057:
---------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12693533/YARN-3057.patch
  against trunk revision 6b17eb9.

    {color:green}+1 @author{color}.  The patch does not contain any @author tags.

    {color:green}+1 tests included{color}.  The patch appears to include 1 new or modified test files.

    {color:green}+1 javac{color}.  The applied patch does not increase the total number of javac compiler warnings.

    {color:green}+1 javadoc{color}.  There were no new javadoc warning messages.

    {color:green}+1 eclipse:eclipse{color}.  The patch built with eclipse:eclipse.

    {color:green}+1 findbugs{color}.  The patch does not introduce any new Findbugs (version 2.0.3) warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase the total number of release audit warnings.

    {color:red}-1 core tests{color}.  The patch failed these unit tests in hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager:

                  org.apache.hadoop.yarn.server.resourcemanager.webapp.TestRMWebServicesAppsModification
                  org.apache.hadoop.yarn.server.resourcemanager.scheduler.fair.TestAllocationFileLoaderService

Test results: https://builds.apache.org/job/PreCommit-YARN-Build/6373//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/6373//console

This message is automatically generated.

> Need update apps' runnability when reloading allocation files for FairScheduler
> -------------------------------------------------------------------------------
>
>                 Key: YARN-3057
>                 URL: https://issues.apache.org/jira/browse/YARN-3057
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: resourcemanager
>            Reporter: Jun Gong
>            Assignee: Jun Gong
>         Attachments: YARN-3057.patch
>
>
> If we submit a app and the number of running app in its corresponding leaf queue has reached its max limit, the app will be put into 'nonRunnableApps'. And its runnabiltiy will only be updated when removing a appattempt(FairScheduler will call `updateRunnabilityOnAppRemoval` at that time).
> Suppose there are only service apps running, they will not finish, so the submitted app will not be scheduled even we change leaf queue's max limit. I think we need update apps' runnability when reloading allocation files for FairScheduler.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)