You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@atlas.apache.org by "Keval Bhatt (Jira)" <ji...@apache.org> on 2020/05/12 06:08:00 UTC
[jira] [Updated] (ATLAS-3789) UI: Date format is not correct for
classfication validity periods.
[ https://issues.apache.org/jira/browse/ATLAS-3789?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Keval Bhatt updated ATLAS-3789:
-------------------------------
Summary: UI: Date format is not correct for classfication validity periods. (was: UI: Date formating is not correct for classfication validity periods.)
> UI: Date format is not correct for classfication validity periods.
> ------------------------------------------------------------------
>
> Key: ATLAS-3789
> URL: https://issues.apache.org/jira/browse/ATLAS-3789
> Project: Atlas
> Issue Type: Bug
> Reporter: Keval Bhatt
> Assignee: Keval Bhatt
> Priority: Major
> Fix For: 2.1.0, 3.0.0
>
>
> While attaching classification to the entity
> 1. selected Add validity Periods.
> 2. Start time-> from datePicker : 2020/04/15 10:11:57 -> after Apply -> 2020/04/15 10:11:57
> 3. End Time -> from datePicker : 2020/04/15 20:11:57 -> after Apply -> 2020/04/15 08:11:57
> 4. Click Add -> invalid parameters: Invalid dateRange: startTime 2020/04/15 10:11:57 must be before endTime 2020/04/15 08:11:57
--
This message was sent by Atlassian Jira
(v8.3.4#803005)