You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@buildr.apache.org by "Pepijn Van Eeckhoudt (JIRA)" <ji...@apache.org> on 2014/08/25 12:13:58 UTC

[jira] [Comment Edited] (BUILDR-688) Compile task should ignore package-info.java when performing uptodate checks

    [ https://issues.apache.org/jira/browse/BUILDR-688?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14108951#comment-14108951 ] 

Pepijn Van Eeckhoudt edited comment on BUILDR-688 at 8/25/14 10:12 AM:
-----------------------------------------------------------------------

-The patch is pretty trivial (see https://github.com/pepijnve/buildr/tree/buildr_688) but it still needs a spec. Any suggestions on how I can test this. I'll need to try and run the compile task twice which is easy enough, but I need delete the project and task state between the two runs. Is there any support for this already somewhere in the test suite?- I've created a spec that defines two distinct projects to check this.




was (Author: pepijnve):
The patch is pretty trivial (see https://github.com/pepijnve/buildr/tree/buildr_688) but it still needs a spec. Any suggestions on how I can test this. I'll need to try and run the compile task twice which is easy enough, but I need delete the project and task state between the two runs. Is there any support for this already somewhere in the test suite?

> Compile task should ignore package-info.java when performing uptodate checks
> ----------------------------------------------------------------------------
>
>                 Key: BUILDR-688
>                 URL: https://issues.apache.org/jira/browse/BUILDR-688
>             Project: Buildr
>          Issue Type: Bug
>          Components: Compilers
>            Reporter: Peter Donald
>            Assignee: Peter Donald
>            Priority: Minor
>             Fix For: 1.4.19
>
>




--
This message was sent by Atlassian JIRA
(v6.2#6252)