You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-dev@hadoop.apache.org by "Sangjin Lee (JIRA)" <ji...@apache.org> on 2016/03/04 01:47:40 UTC
[jira] [Created] (YARN-4761) NMs reconnecting with changed
capabilities can lead to wrong cluster resource calculations on fair
scheduler
Sangjin Lee created YARN-4761:
---------------------------------
Summary: NMs reconnecting with changed capabilities can lead to wrong cluster resource calculations on fair scheduler
Key: YARN-4761
URL: https://issues.apache.org/jira/browse/YARN-4761
Project: Hadoop YARN
Issue Type: Bug
Components: fairscheduler
Affects Versions: 2.6.4
Reporter: Sangjin Lee
Assignee: Sangjin Lee
YARN-3802 uncovered an issue with the scheduler where the resource calculation can be incorrect due to async event handling. It was subsequently fixed by YARN-4344, but it was never fixed for the fair scheduler.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)