You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Andrew Purtell (JIRA)" <ji...@apache.org> on 2015/08/20 03:25:46 UTC
[jira] [Reopened] (HBASE-14225) Exclude **/target/** from RAT
checks
[ https://issues.apache.org/jira/browse/HBASE-14225?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andrew Purtell reopened HBASE-14225:
------------------------------------
Assignee: Andrew Purtell
Nope, we need this. Even after upgrading to RAT 0.11 (see HBASE-14264), if I don't add **/target/** to the exclude lists, RC builds fail at the second maven invocation. Maybe it's only an issue with 0.98? Attaching a patch specific for 0.98
> Exclude **/target/** from RAT checks
> ------------------------------------
>
> Key: HBASE-14225
> URL: https://issues.apache.org/jira/browse/HBASE-14225
> Project: HBase
> Issue Type: Bug
> Components: build
> Reporter: Andrew Purtell
> Assignee: Andrew Purtell
> Fix For: 0.98.14
>
>
> We need to exclude **/target/** from RAT checks in order to build releases now.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)