You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@sling.apache.org by "Carsten Ziegeler (JIRA)" <ji...@apache.org> on 2010/02/04 09:08:27 UTC
[jira] Created: (SLING-1349) Check if parallel property for jobs
has value false
Check if parallel property for jobs has value false
---------------------------------------------------
Key: SLING-1349
URL: https://issues.apache.org/jira/browse/SLING-1349
Project: Sling
Issue Type: Improvement
Components: Extensions
Affects Versions: Extensions Event 2.1.0
Reporter: Carsten Ziegeler
Assignee: Carsten Ziegeler
Fix For: Extensions Event 2.2.0
Currently the parallel property for processing jobs is only checked for existing or non-existing. However this handling is a little bit confusing as for example
if the parallel property has the value "false" the job is still processed in parallel.
We should check the value for "no" and "false"
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.
[jira] Resolved: (SLING-1349) Check if parallel property for jobs
has value false
Posted by "Carsten Ziegeler (JIRA)" <ji...@apache.org>.
[ https://issues.apache.org/jira/browse/SLING-1349?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Carsten Ziegeler resolved SLING-1349.
-------------------------------------
Resolution: Fixed
Enhanced the property handling in Revision: 906395
> Check if parallel property for jobs has value false
> ---------------------------------------------------
>
> Key: SLING-1349
> URL: https://issues.apache.org/jira/browse/SLING-1349
> Project: Sling
> Issue Type: Improvement
> Components: Extensions
> Affects Versions: Extensions Event 2.1.0
> Reporter: Carsten Ziegeler
> Assignee: Carsten Ziegeler
> Fix For: Extensions Event 2.2.0
>
>
> Currently the parallel property for processing jobs is only checked for existing or non-existing. However this handling is a little bit confusing as for example
> if the parallel property has the value "false" the job is still processed in parallel.
> We should check the value for "no" and "false"
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.
[jira] Closed: (SLING-1349) Check if parallel property for jobs has
value false
Posted by "Carsten Ziegeler (JIRA)" <ji...@apache.org>.
[ https://issues.apache.org/jira/browse/SLING-1349?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Carsten Ziegeler closed SLING-1349.
-----------------------------------
> Check if parallel property for jobs has value false
> ---------------------------------------------------
>
> Key: SLING-1349
> URL: https://issues.apache.org/jira/browse/SLING-1349
> Project: Sling
> Issue Type: Improvement
> Components: Extensions
> Affects Versions: Extensions Event 2.1.0
> Reporter: Carsten Ziegeler
> Assignee: Carsten Ziegeler
> Fix For: Extensions Event 2.2.0
>
>
> Currently the parallel property for processing jobs is only checked for existing or non-existing. However this handling is a little bit confusing as for example
> if the parallel property has the value "false" the job is still processed in parallel.
> We should check the value for "no" and "false"
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.