You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@jmeter.apache.org by bu...@apache.org on 2012/05/29 16:10:37 UTC
[Bug 53317] New: Add an option to pause rampup
https://issues.apache.org/bugzilla/show_bug.cgi?id=53317
Priority: P2
Bug ID: 53317
Assignee: issues@jmeter.apache.org
Summary: Add an option to pause rampup
Severity: normal
Classification: Unclassified
Reporter: oliver_lloyd@hotmail.com
Hardware: All
Status: NEW
Version: 2.7
Component: Main
Product: JMeter
Presently, once a test has begun, then the rampup logic will continue to add
threads at the defined rate until the rampup period has expired.
This is a RFE for:
1. An option to pause the rampup such that any threads that have already been
started continue to execute but no new threads are added
2. A related option to resume the rampup and continue to add threads at the
previous rate.
--
You are receiving this mail because:
You are the assignee for the bug.
[Bug 53317] Add an option to pause rampup
Posted by bu...@apache.org.
https://issues.apache.org/bugzilla/show_bug.cgi?id=53317
oliver lloyd <ol...@hotmail.com> changed:
What |Removed |Added
----------------------------------------------------------------------------
OS| |All
Severity|normal |enhancement
--
You are receiving this mail because:
You are the assignee for the bug.