You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@sling.apache.org by "Robert Munteanu (JIRA)" <ji...@apache.org> on 2013/09/14 01:00:52 UTC
[jira] [Created] (SLING-3064) Disable content sync when importing
content
Robert Munteanu created SLING-3064:
--------------------------------------
Summary: Disable content sync when importing content
Key: SLING-3064
URL: https://issues.apache.org/jira/browse/SLING-3064
Project: Sling
Issue Type: Bug
Components: IDE
Reporter: Robert Munteanu
Priority: Minor
Fix For: Sling Eclipse IDE 1.0.0
When importing content resource change events are fired and - at least in the default setting - resources are synchronized back to the repository. This generates unneeded load on the repository and makes the import action slow.
Our current mechanism does not work, since the publishing is done asynchronously on a different thread, and therefore we can't affect it reliably.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira