You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@ambari.apache.org by "Vitaly Brodetskyi (JIRA)" <ji...@apache.org> on 2014/08/21 16:59:11 UTC
[jira] [Created] (AMBARI-6975) Brocken upgrade 1.6.0->1.7.0 and
1.6.1->1.7.0 after renaming of "value" column
Vitaly Brodetskyi created AMBARI-6975:
-----------------------------------------
Summary: Brocken upgrade 1.6.0->1.7.0 and 1.6.1->1.7.0 after renaming of "value" column
Key: AMBARI-6975
URL: https://issues.apache.org/jira/browse/AMBARI-6975
Project: Ambari
Issue Type: Task
Components: agent
Affects Versions: 1.7.0
Reporter: Vitaly Brodetskyi
Assignee: Vitaly Brodetskyi
Priority: Critical
Fix For: 1.7.0
After "value" column was renamed to "sequence_value" in ambari_sequence table, we should rename this column name in DML for 1.6.0 and 1.6.1 too. For 1.5.0 i have already fixed that(soon will commit it).
--
This message was sent by Atlassian JIRA
(v6.2#6252)