You are viewing a plain text version of this content. The canonical link for it is here.
Posted to mapreduce-issues@hadoop.apache.org by "Robert Joseph Evans (JIRA)" <ji...@apache.org> on 2011/07/14 15:27:00 UTC
[jira] [Commented] (MAPREDUCE-2324) Job should fail if a reduce
task can't be scheduled anywhere
[ https://issues.apache.org/jira/browse/MAPREDUCE-2324?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13065249#comment-13065249 ]
Robert Joseph Evans commented on MAPREDUCE-2324:
------------------------------------------------
I just found the same issue and I am looking into what is the best way to solve it.
If mapreduce.reduce.input.limit is mis-configured or if a cluster is just running low on disk space in general then reduces with large a input may never get scheduled causing the Job to never fail and never succeed, just starve until the job is killed.
The JobInProgess tries to guess at the size of the input to all reducers in a job. If the size is over mapreduce.reduce.input.limit then the job is killed. If it is not then findNewReduceTask() checks to see if the estimated size is too big to fit on the node currently looking for work. If it is not then it will let some other task have a chance at the slot.
The idea is to keep track of how often it happens that a Reduce Slot is rejected because of the lack of space vs how often it succeeds and then guess if the reduce tasks will ever be scheduled.
So I would like some feedback on this.
1) How should we guess. Someone who found the bug here suggested P1 + (P2 * S), where S is the number of successful assignments. Possibly P1 = 20 and P2 = 2.0. I am not really sure.
2) What should we do when we guess that it will never get a slot? Should we fail the job or do we say, even though it might fail, well lets just schedule the it and see if it really will fail.
> Job should fail if a reduce task can't be scheduled anywhere
> ------------------------------------------------------------
>
> Key: MAPREDUCE-2324
> URL: https://issues.apache.org/jira/browse/MAPREDUCE-2324
> Project: Hadoop Map/Reduce
> Issue Type: Bug
> Affects Versions: 0.20.2
> Reporter: Todd Lipcon
> Assignee: Robert Joseph Evans
>
> If there's a reduce task that needs more disk space than is available on any mapred.local.dir in the cluster, that task will stay pending forever. For example, we produced this in a QA cluster by accidentally running terasort with one reducer - since no mapred.local.dir had 1T free, the job remained in pending state for several days. The reason for the "stuck" task wasn't clear from a user perspective until we looked at the JT logs.
> Probably better to just fail the job if a reduce task goes through all TTs and finds that there isn't enough space.
--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira