You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hive.apache.org by "Xiaobing Zhou (JIRA)" <ji...@apache.org> on 2015/02/04 23:11:36 UTC

[jira] [Updated] (HIVE-9518) Implement MONTHS_BETWEEN aligned with Oracle one

     [ https://issues.apache.org/jira/browse/HIVE-9518?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Xiaobing Zhou updated HIVE-9518:
--------------------------------
    Attachment: HIVE-9518.3.patch

> Implement MONTHS_BETWEEN aligned with Oracle one
> ------------------------------------------------
>
>                 Key: HIVE-9518
>                 URL: https://issues.apache.org/jira/browse/HIVE-9518
>             Project: Hive
>          Issue Type: Bug
>            Reporter: Xiaobing Zhou
>            Assignee: Xiaobing Zhou
>         Attachments: HIVE-9518.1.patch, HIVE-9518.2.patch, HIVE-9518.3.patch
>
>
> This is used to track work to build Oracle like months_between. Here's semantics:
> MONTHS_BETWEEN returns number of months between dates date1 and date2. If date1 is later than date2, then the result is positive. If date1 is earlier than date2, then the result is negative. If date1 and date2 are either the same days of the month or both last days of months, then the result is always an integer. Otherwise Oracle Database calculates the fractional portion of the result based on a 31-day month and considers the difference in time components date1 and date2.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)