You are viewing a plain text version of this content. The canonical link for it is here.
Posted to jira@arrow.apache.org by "Antoine Pitrou (Jira)" <ji...@apache.org> on 2022/01/24 12:56:00 UTC
[jira] [Resolved] (ARROW-15385) Split integration test between duration and interval
[ https://issues.apache.org/jira/browse/ARROW-15385?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Antoine Pitrou resolved ARROW-15385.
------------------------------------
Fix Version/s: 7.0.0
Resolution: Fixed
Issue resolved by pull request 12197
[https://github.com/apache/arrow/pull/12197]
> Split integration test between duration and interval
> ----------------------------------------------------
>
> Key: ARROW-15385
> URL: https://issues.apache.org/jira/browse/ARROW-15385
> Project: Apache Arrow
> Issue Type: Test
> Components: Integration
> Reporter: Jorge Leitão
> Assignee: Jorge Leitão
> Priority: Minor
> Labels: pull-request-available
> Fix For: 7.0.0
>
> Time Spent: 10m
> Remaining Estimate: 0h
>
> Some implementations support durations, just not intervals
--
This message was sent by Atlassian Jira
(v8.20.1#820001)