You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@flink.apache.org by "Till Rohrmann (JIRA)" <ji...@apache.org> on 2018/03/16 10:56:00 UTC
[jira] [Created] (FLINK-8976) End-to-end test: Resume with
different parallelism
Till Rohrmann created FLINK-8976:
------------------------------------
Summary: End-to-end test: Resume with different parallelism
Key: FLINK-8976
URL: https://issues.apache.org/jira/browse/FLINK-8976
Project: Flink
Issue Type: Sub-task
Components: Tests
Affects Versions: 1.5.0
Reporter: Till Rohrmann
Assignee: Tzu-Li (Gordon) Tai
Fix For: 1.5.0
Similar to FLINK-8975, we should have an end-to-end test which resumes a job with a different parallelism after taking
a) a savepoint
b) from the last retained checkpoint (this won't work with RocksDB incremental checkpoints)
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)