You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Tao Yang (JIRA)" <ji...@apache.org> on 2018/10/26 02:18:00 UTC
[jira] [Created] (YARN-8945) Calculation of Maximum applications
should respect specified and global maximum applications for absolute
resource
Tao Yang created YARN-8945:
------------------------------
Summary: Calculation of Maximum applications should respect specified and global maximum applications for absolute resource
Key: YARN-8945
URL: https://issues.apache.org/jira/browse/YARN-8945
Project: Hadoop YARN
Issue Type: Bug
Components: capacityscheduler
Affects Versions: 3.2.0
Reporter: Tao Yang
Assignee: Tao Yang
Currently maximum applications is expected to be calculated as follow according to priority when using percentage based capacity:
(1) equals specified maximum applications for queues
(2) equals global maximum applications
(3) calculated as queue-capacity * maximum-system-applications
But for absolute resource configuration, maximum applications is calculated as (3) in ParentQueue#deriveCapacityFromAbsoluteConfigurations, this is a strict limit for high max-capacity and low capacity queues which have little guaranteed resources but want to use lots of share resources. So I propose to share the maximum applications calculation of percentage based capacity, absolute resource can call the same calculation if necessary.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-issues-help@hadoop.apache.org