You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@ambari.apache.org by "Antonenko Alexander (JIRA)" <ji...@apache.org> on 2016/02/17 10:50:18 UTC
[jira] [Created] (AMBARI-15070) Graph scale behaviour is incorrect
if time range is switched before graph data API call is complete
Antonenko Alexander created AMBARI-15070:
--------------------------------------------
Summary: Graph scale behaviour is incorrect if time range is switched before graph data API call is complete
Key: AMBARI-15070
URL: https://issues.apache.org/jira/browse/AMBARI-15070
Project: Ambari
Issue Type: Bug
Components: ambari-web
Affects Versions: 2.2.2
Reporter: Antonenko Alexander
Assignee: Antonenko Alexander
Fix For: 2.2.2
*STR*
# Switch metrics time range from 'Last 1 hour' to 'Last 1 year' (for example, on Dashboard; data for 1 year should be available).
# While metrics API call is pending, switch time range back to 1 hour (can be reproduced if connection rate is low or server is highly loaded so that requests are being processed slowly).
*Result*
After request with data for last year is complete, it's displayed on the graph, but the scale is rendered with an accuracy to 1 hour which makes graph unusable
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)