You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@climate.apache.org by "Michael Joyce (JIRA)" <ji...@apache.org> on 2014/04/05 01:51:14 UTC
[jira] [Created] (CLIMATE-391) Date ranges for UI evaluation are
not normalized
Michael Joyce created CLIMATE-391:
-------------------------------------
Summary: Date ranges for UI evaluation are not normalized
Key: CLIMATE-391
URL: https://issues.apache.org/jira/browse/CLIMATE-391
Project: Apache Open Climate Workbench
Issue Type: Bug
Components: webapp
Affects Versions: 0.3-incubating
Reporter: Michael Joyce
Assignee: Michael Joyce
Fix For: 0.4
The date ranges that the evaluation UI passes to the backend are not normalized before attempting to subset datasets. This can result in an issue where a dataset's time values have been shifted to the start of the month (in the non-daily data case) while the subset's time values still point to a different day later in the month. This results in the subset being "out of bounds" even though it should be valid.
--
This message was sent by Atlassian JIRA
(v6.2#6252)