You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@drill.apache.org by "Aman Sinha (JIRA)" <ji...@apache.org> on 2014/05/02 01:30:17 UTC
[jira] [Updated] (DRILL-576) Add cost model for distribution and
enable new plans
[ https://issues.apache.org/jira/browse/DRILL-576?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Aman Sinha updated DRILL-576:
-----------------------------
Attachment: 0001-Fix-DRILL-576-Cumulative-changes-for-Drill-costing-n.patch
> Add cost model for distribution and enable new plans
> ----------------------------------------------------
>
> Key: DRILL-576
> URL: https://issues.apache.org/jira/browse/DRILL-576
> Project: Apache Drill
> Issue Type: Bug
> Reporter: Aman Sinha
> Assignee: Aman Sinha
> Attachments: 0001-Fix-DRILL-576-Cumulative-changes-for-Drill-costing-n.patch
>
>
> Add cost model for Drill to include distribution costs and enable new plans:
> - enable hash join and hash aggregate plans through the cost based comparison with existing merge join and streaming aggregate plans.
> - allow creating join and aggregation plans with alternative distributions.
--
This message was sent by Atlassian JIRA
(v6.2#6252)