You are viewing a plain text version of this content. The canonical link for it is here.
Posted to hdfs-dev@hadoop.apache.org by "Suresh Srinivas (JIRA)" <ji...@apache.org> on 2014/02/25 22:53:22 UTC
[jira] [Resolved] (HDFS-3225) Revist upgrade snapshots, roll back,
finalize to enable rolling upgrades
[ https://issues.apache.org/jira/browse/HDFS-3225?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Suresh Srinivas resolved HDFS-3225.
-----------------------------------
Resolution: Done
The rolling upgrade and the related issues have been address in the umbrella jiar, HDFS-5535. I do not think there is any work that needs to be done to address this. Resolving this as "Done"
> Revist upgrade snapshots, roll back, finalize to enable rolling upgrades
> ------------------------------------------------------------------------
>
> Key: HDFS-3225
> URL: https://issues.apache.org/jira/browse/HDFS-3225
> Project: Hadoop HDFS
> Issue Type: Sub-task
> Reporter: Sanjay Radia
> Assignee: Sanjay Radia
>
> With introduction of wire comaptibility, HDFS is ready for rolling upgrades. Various design choices such as version checks and when to do upgrade snaopshots, rollbacks, finalize need to be revisited.
--
This message was sent by Atlassian JIRA
(v6.1.5#6160)