You are viewing a plain text version of this content. The canonical link for it is here.
Posted to jira@arrow.apache.org by "Apache Arrow JIRA Bot (Jira)" <ji...@apache.org> on 2020/09/14 03:35:00 UTC
[jira] [Assigned] (ARROW-9990) [Rust] [DataFusion] NOT is not
plannable
[ https://issues.apache.org/jira/browse/ARROW-9990?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Apache Arrow JIRA Bot reassigned ARROW-9990:
--------------------------------------------
Assignee: Apache Arrow JIRA Bot (was: Jorge)
> [Rust] [DataFusion] NOT is not plannable
> ----------------------------------------
>
> Key: ARROW-9990
> URL: https://issues.apache.org/jira/browse/ARROW-9990
> Project: Apache Arrow
> Issue Type: Bug
> Reporter: Jorge
> Assignee: Apache Arrow JIRA Bot
> Priority: Major
> Labels: pull-request-available
> Time Spent: 10m
> Remaining Estimate: 0h
>
> We have the physical operator, but it is not usable in the logical planning.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)