Posted to notifications@accumulo.apache.org by "Eric Newton (JIRA)" <ji...@apache.org> on 2014/09/16 17:42:34 UTC
[jira] [Created] (ACCUMULO-3133) test wait scaling should apply to
many other waits
Eric Newton created ACCUMULO-3133:
-------------------------------------
Summary: test wait scaling should apply to many other waits
Key: ACCUMULO-3133
URL: https://issues.apache.org/jira/browse/ACCUMULO-3133
Project: Accumulo
Issue Type: Improvement
Components: test
Reporter: Eric Newton
Priority: Minor
Fix For: 1.7.0
The testing infrastructure allows for longer timeouts by configuration, which allows for modest systems to run the tests, as well as running the tests in parallel. Unfortunately, many tests have hard-coded waits, which are not scaled, causing them to fail. Modify all the test wait code so that they are similarly scaled.
--