You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Mike Drob (JIRA)" <ji...@apache.org> on 2018/10/10 23:22:00 UTC
[jira] [Created] (HBASE-21287) JVMClusterUtil Master initialization
wait time not configurable
Mike Drob created HBASE-21287:
---------------------------------
Summary: JVMClusterUtil Master initialization wait time not configurable
Key: HBASE-21287
URL: https://issues.apache.org/jira/browse/HBASE-21287
Project: HBase
Issue Type: Task
Components: test
Reporter: Mike Drob
Assignee: Mike Drob
We can configure how long the local cluster threads will wait for master to come up and become active, but not how long we allow initialization to take. Being able to tune this would improve my test loop on some experiment I am running.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)