Incubator PMC/Board report for Feb 2013 ([ppmc])


Dear podling,

This email was sent by an automated system on behalf of the Apache Incubator PMC.
It is an initial reminder to give you plenty of time to prepare your quarterly
board report.

The board meeting is scheduled for Wed, 20 February 2013, 10:30:00:00 PST. The report 
for your podling will form a part of the Incubator PMC report. The Incubator PMC 
requires your report to be submitted 2 weeks before the board meeting, to allow 
sufficient time for review and submission (Wed, Feb 6th).

Please submit your report with sufficient time to allow the incubator PMC, and 
subsequently board members to review and digest. Again, the very latest you 
should submit your report is 2 weeks prior to the board meeting.

Thanks,

The Apache Incubator PMC

Submitting your Report
----------------------

Your report should contain the following:

 * Your project name
 * A brief description of your project, which assumes no knowledge of the project
   or necessarily of its field
 * A list of the three most important issues to address in the move towards 
   graduation.
 * Any issues that the Incubator PMC or ASF Board might wish/need to be aware of
 * How has the community developed since the last report
 * How has the project developed since the last report.
 
This should be appended to the Incubator Wiki page at:

  http://wiki.apache.org/incubator/February2013

Note: This manually populated. You may need to wait a little before this page is
      created from a template.

Mentors
-------
Mentors should review reports for their project(s) and sign them off on the 
Incubator wiki page. Signing off reports shows that you are following the 
project - projects that are not signed may raise alarms for the Incubator PMC.

Incubator PMC


Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Sergio Fernández <se...@salzburgresearch.at>.
Hi,

On 31/01/13 10:08, Andy Seaborne wrote:
> Looks good - the incubator PMC has a lot of reports to process so being
> brief and focused on the incubation process is right. YOu can imageine
> that the first Q the IMPC has is "is the podling making progress?" and
> the answer given by the report is clearly "yes."

:-)

> Having the mailing list report after an IRC meeting is important and IMO
> worth mentioning as mitigation of the barriers to people in different
> timezones that IRC causes.

I'll mention such detail.

> Is this IRC usage primarily due to LMF or will it continue after
> Marmotta is separated out?

Yes, for sure, although probably not with this intensity. It'd depend on 
the target goal of each sprint.


> On 31/01/13 07:33, Sergio Fernández wrote:
>> Here a first draft for the report:
>>
>> --------------------
>> Marmotta
>>
>> An open implementation of a Linked Data Platform.
>>
>> Marmotta has been incubating since 2012-12-03.
>>
>> Three most important issues to address in the move towards graduation:
>>
>> 1. Ingest code and clear IP.
>> 2. A release
>> 3. Build dev and PMC.
>>
>> Any issues that the Incubator PMC (IPMC) or ASF Board wish/need to be
>> aware of?
>>
>> No such issues.
>>
>> How has the community developed since the last report?
>>
>> * Communication mechanisms have been successfully setup: the
>> dev@marmotta mailing list has quite important traffic, Jira already
>> registers 50 issues, periodic meeting at IRC. This enabled the
>> participation of new people in the community of the project.
>> * Branding (logo) almost ready. trademarks@apache already contacted.
>> * Awaiting for the site installation.
>>
>> How has the project developed since the last report?
>>
>> The project is about publish the last release of the former project
>> (LMF), to them contribute the parts that will be actually Marmotta. This
>> last full release already prepares some tasks for Marmotta, such as
>> architectural changes and dependencies clean up. After this major
>> milestone, the project's ambition is a rapid turnaround to get an Apache
>> incubator release as soon as possible.
>>
>> Please check this [ ] when you have filled in the report for Marmotta.
>>
>> Signed-off-by:
>> Fabian Christ: [ ](marmotta)
>> Nandana Mihindukulasooriya: [ ](marmotta)
>> Andy Seaborne: [ ](marmotta)
>>
>>
>> Shepherd notes:
>>
>> --------------------
>>
>> On 30/01/13 18:11, Marvin wrote:
>>> Dear podling,
>>>
>>> This email was sent by an automated system on behalf of the Apache
>>> Incubator PMC.
>>> It is an initial reminder to give you plenty of time to prepare your
>>> quarterly
>>> board report.
>>>
>>> The board meeting is scheduled for Wed, 20 February 2013, 10:30:00:00
>>> PST. The report
>>> for your podling will form a part of the Incubator PMC report. The
>>> Incubator PMC
>>> requires your report to be submitted 2 weeks before the board meeting,
>>> to allow
>>> sufficient time for review and submission (Wed, Feb 6th).
>>>
>>> Please submit your report with sufficient time to allow the incubator
>>> PMC, and
>>> subsequently board members to review and digest. Again, the very
>>> latest you
>>> should submit your report is 2 weeks prior to the board meeting.
>>>
>>> Thanks,
>>>
>>> The Apache Incubator PMC
>>>
>>> Submitting your Report
>>> ----------------------
>>>
>>> Your report should contain the following:
>>>
>>> * Your project name
>>> * A brief description of your project, which assumes no knowledge of
>>> the project
>>> or necessarily of its field
>>> * A list of the three most important issues to address in the move
>>> towards
>>> graduation.
>>> * Any issues that the Incubator PMC or ASF Board might wish/need to
>>> be aware of
>>> * How has the community developed since the last report
>>> * How has the project developed since the last report.
>>>
>>> This should be appended to the Incubator Wiki page at:
>>>
>>> http://wiki.apache.org/incubator/February2013
>>>
>>> Note: This manually populated. You may need to wait a little before
>>> this page is
>>> created from a template.
>>>
>>> Mentors
>>> -------
>>> Mentors should review reports for their project(s) and sign them off
>>> on the
>>> Incubator wiki page. Signing off reports shows that you are following
>>> the
>>> project - projects that are not signed may raise alarms for the
>>> Incubator PMC.
>>>
>>> Incubator PMC
>>>
>>
>

-- 
Sergio Fernández
Salzburg Research
+43 662 2288 318
Jakob-Haringer Strasse 5/II
A-5020 Salzburg (Austria)
http://www.salzburgresearch.at

Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Nandana Mihindukulasooriya <na...@gmail.com>.
Hi,

On Mon, Feb 4, 2013 at 12:42 PM, Sergio Fernández <wi...@apache.org> wrote:

> OK, now all mentors have signed. Thanks!
>
> Do you know when do we need to write the next one? Hope we'd be able to
> report an Apache incubator release ;-)


Yes, that would be great. The next one should be April.

Group 1 = January, April, July, October (Currently monthly: December,
January, February) [1]

Best Regards,
Nandana

[1] - http://incubator.apache.org/report-next-month.html

Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Fabian Christ <ch...@googlemail.com>.
Hi,

here is the incubator reporting schedule

http://incubator.apache.org/report-groups.txt

- Fabian

2013/2/4 Sergio Fernández <wi...@apache.org>:
> OK, now all mentors have signed. Thanks!
>
> Do you know when do we need to write the next one? Hope we'd be able to
> report an Apache incubator release ;-)
>
>
> On 04/02/13 09:20, Fabian Christ wrote:
>>
>> Hi,
>>
>> thanks for the report - well done! I've signed it.
>>
>> Best,
>>   - Fabian
>>
>> 2013/2/1 Nandana Mihindukulasooriya<na...@gmail.com>:
>>>
>>> Hi,
>>>
>>> On Fri, Feb 1, 2013 at 11:52 AM, Andy Seaborne<an...@apache.org>  wrote:
>>>
>>>> On 01/02/13 10:05, Sergio Fernández wrote:
>>>>
>>>>> Report already submitted addressing the feedback received:
>>>>>
>>>>>
>>>>> http://wiki.apache.org/**incubator/February2013<http://wiki.apache.org/incubator/February2013>
>>>>>
>>>>> Please, the mentors would need to sign it before next Wednesday,
>>>>> February 6th.
>>>>
>>>>
>>>>
>>> Thanks and congratulations for the good work !! I've signed the report
>>> too.
>>>
>>> Best Regards,
>>> Nandana
>>
>>
>>
>>
>
> --
> Sergio Fernández



-- 
Fabian
http://twitter.com/fctwitt

Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Sergio Fernández <wi...@apache.org>.
OK, now all mentors have signed. Thanks!

Do you know when do we need to write the next one? Hope we'd be able to 
report an Apache incubator release ;-)

On 04/02/13 09:20, Fabian Christ wrote:
> Hi,
>
> thanks for the report - well done! I've signed it.
>
> Best,
>   - Fabian
>
> 2013/2/1 Nandana Mihindukulasooriya<na...@gmail.com>:
>> Hi,
>>
>> On Fri, Feb 1, 2013 at 11:52 AM, Andy Seaborne<an...@apache.org>  wrote:
>>
>>> On 01/02/13 10:05, Sergio Fernández wrote:
>>>
>>>> Report already submitted addressing the feedback received:
>>>>
>>>>     http://wiki.apache.org/**incubator/February2013<http://wiki.apache.org/incubator/February2013>
>>>>
>>>> Please, the mentors would need to sign it before next Wednesday,
>>>> February 6th.
>>>
>>>
>> Thanks and congratulations for the good work !! I've signed the report too.
>>
>> Best Regards,
>> Nandana
>
>
>

-- 
Sergio Fernández

Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Fabian Christ <ch...@googlemail.com>.
Hi,

thanks for the report - well done! I've signed it.

Best,
 - Fabian

2013/2/1 Nandana Mihindukulasooriya <na...@gmail.com>:
> Hi,
>
> On Fri, Feb 1, 2013 at 11:52 AM, Andy Seaborne <an...@apache.org> wrote:
>
>> On 01/02/13 10:05, Sergio Fernández wrote:
>>
>>> Report already submitted addressing the feedback received:
>>>
>>>    http://wiki.apache.org/**incubator/February2013<http://wiki.apache.org/incubator/February2013>
>>>
>>> Please, the mentors would need to sign it before next Wednesday,
>>> February 6th.
>>
>>
> Thanks and congratulations for the good work !! I've signed the report too.
>
> Best Regards,
> Nandana



-- 
Fabian
http://twitter.com/fctwitt

Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Nandana Mihindukulasooriya <na...@gmail.com>.
Hi,

On Fri, Feb 1, 2013 at 11:52 AM, Andy Seaborne <an...@apache.org> wrote:

> On 01/02/13 10:05, Sergio Fernández wrote:
>
>> Report already submitted addressing the feedback received:
>>
>>    http://wiki.apache.org/**incubator/February2013<http://wiki.apache.org/incubator/February2013>
>>
>> Please, the mentors would need to sign it before next Wednesday,
>> February 6th.
>
>
Thanks and congratulations for the good work !! I've signed the report too.

Best Regards,
Nandana

Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Andy Seaborne <an...@apache.org>.
On 01/02/13 10:05, Sergio Fernández wrote:
> Report already submitted addressing the feedback received:
>
>    http://wiki.apache.org/incubator/February2013
>
> Please, the mentors would need to sign it before next Wednesday,
> February 6th.

I've signed

	Andy

>
> Greetings,
>
> On 31/01/13 12:25, Sebastian Schaffert wrote:
>> Hi Andy,
>>
>>
>> 2013/1/31 Andy Seaborne<an...@apache.org>
>>
>>> Looks good - the incubator PMC has a lot of reports to process so being
>>> brief and focused on the incubation process is right.  YOu can imageine
>>> that the first Q the IMPC has is "is the podling making progress?"
>>> and the
>>> answer given by the report is clearly "yes."
>>>
>>> Having the mailing list report after an IRC meeting is important and IMO
>>> worth mentioning as mitigation of the barriers to people in different
>>> timezones that IRC causes.
>>>
>>> Is this IRC usage primarily due to LMF or will it continue after
>>> Marmotta
>>> is separated out?
>>>
>>>
>>
>>
>> I would like keeping the IRC meetings but depending on open tasks maybe
>> reduced to once a week. The IRC meetings have the big advantage that
>> everything is documented by the ASF bot, and they are useful when
>> applying
>> a Scrum-style to project management. :-)
>>
>> Greetings,
>>
>> Sebastian
>>
>


Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Sergio Fernández <wi...@apache.org>.
Report already submitted addressing the feedback received:

   http://wiki.apache.org/incubator/February2013

Please, the mentors would need to sign it before next Wednesday, 
February 6th.

Greetings,

On 31/01/13 12:25, Sebastian Schaffert wrote:
> Hi Andy,
>
>
> 2013/1/31 Andy Seaborne<an...@apache.org>
>
>> Looks good - the incubator PMC has a lot of reports to process so being
>> brief and focused on the incubation process is right.  YOu can imageine
>> that the first Q the IMPC has is "is the podling making progress?" and the
>> answer given by the report is clearly "yes."
>>
>> Having the mailing list report after an IRC meeting is important and IMO
>> worth mentioning as mitigation of the barriers to people in different
>> timezones that IRC causes.
>>
>> Is this IRC usage primarily due to LMF or will it continue after Marmotta
>> is separated out?
>>
>>
>
>
> I would like keeping the IRC meetings but depending on open tasks maybe
> reduced to once a week. The IRC meetings have the big advantage that
> everything is documented by the ASF bot, and they are useful when applying
> a Scrum-style to project management. :-)
>
> Greetings,
>
> Sebastian
>

-- 
Sergio Fernández

Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Sebastian Schaffert <se...@gmail.com>.
Hi Andy,


2013/1/31 Andy Seaborne <an...@apache.org>

> Looks good - the incubator PMC has a lot of reports to process so being
> brief and focused on the incubation process is right.  YOu can imageine
> that the first Q the IMPC has is "is the podling making progress?" and the
> answer given by the report is clearly "yes."
>
> Having the mailing list report after an IRC meeting is important and IMO
> worth mentioning as mitigation of the barriers to people in different
> timezones that IRC causes.
>
> Is this IRC usage primarily due to LMF or will it continue after Marmotta
> is separated out?
>
>


I would like keeping the IRC meetings but depending on open tasks maybe
reduced to once a week. The IRC meetings have the big advantage that
everything is documented by the ASF bot, and they are useful when applying
a Scrum-style to project management. :-)

Greetings,

Sebastian

Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Andy Seaborne <an...@apache.org>.
Looks good - the incubator PMC has a lot of reports to process so being 
brief and focused on the incubation process is right.  YOu can imageine 
that the first Q the IMPC has is "is the podling making progress?" and 
the answer given by the report is clearly "yes."

Having the mailing list report after an IRC meeting is important and IMO 
worth mentioning as mitigation of the barriers to people in different 
timezones that IRC causes.

Is this IRC usage primarily due to LMF or will it continue after 
Marmotta is separated out?

	Andy

On 31/01/13 07:33, Sergio Fernández wrote:
> Here a first draft for the report:
>
> --------------------
> Marmotta
>
> An open implementation of a Linked Data Platform.
>
> Marmotta has been incubating since 2012-12-03.
>
> Three most important issues to address in the move towards graduation:
>
>    1. Ingest code and clear IP.
>    2. A release
>    3. Build dev and PMC.
>
> Any issues that the Incubator PMC (IPMC) or ASF Board wish/need to be
> aware of?
>
> No such issues.
>
> How has the community developed since the last report?
>
> * Communication mechanisms have been successfully setup: the
> dev@marmotta mailing list has quite important traffic, Jira already
> registers 50 issues, periodic meeting at IRC. This enabled the
> participation of new people in the community of the project.
> * Branding (logo) almost ready. trademarks@apache already contacted.
> * Awaiting for the site installation.
>
> How has the project developed since the last report?
>
> The project is about publish the last release of the former project
> (LMF), to them contribute the parts that will be actually Marmotta. This
> last full release already prepares some tasks for Marmotta, such as
> architectural changes and dependencies clean up. After this major
> milestone, the project's ambition is a rapid turnaround to get an Apache
> incubator release as soon as possible.
>
> Please check this [ ] when you have filled in the report for Marmotta.
>
> Signed-off-by:
> Fabian Christ: [ ](marmotta)
> Nandana Mihindukulasooriya: [ ](marmotta)
> Andy Seaborne: [ ](marmotta)
>
>
> Shepherd notes:
>
> --------------------
>
> On 30/01/13 18:11, Marvin wrote:
>> Dear podling,
>>
>> This email was sent by an automated system on behalf of the Apache
>> Incubator PMC.
>> It is an initial reminder to give you plenty of time to prepare your
>> quarterly
>> board report.
>>
>> The board meeting is scheduled for Wed, 20 February 2013, 10:30:00:00
>> PST. The report
>> for your podling will form a part of the Incubator PMC report. The
>> Incubator PMC
>> requires your report to be submitted 2 weeks before the board meeting,
>> to allow
>> sufficient time for review and submission (Wed, Feb 6th).
>>
>> Please submit your report with sufficient time to allow the incubator
>> PMC, and
>> subsequently board members to review and digest. Again, the very
>> latest you
>> should submit your report is 2 weeks prior to the board meeting.
>>
>> Thanks,
>>
>> The Apache Incubator PMC
>>
>> Submitting your Report
>> ----------------------
>>
>> Your report should contain the following:
>>
>>   * Your project name
>>   * A brief description of your project, which assumes no knowledge of
>> the project
>>     or necessarily of its field
>>   * A list of the three most important issues to address in the move
>> towards
>>     graduation.
>>   * Any issues that the Incubator PMC or ASF Board might wish/need to
>> be aware of
>>   * How has the community developed since the last report
>>   * How has the project developed since the last report.
>>
>> This should be appended to the Incubator Wiki page at:
>>
>>    http://wiki.apache.org/incubator/February2013
>>
>> Note: This manually populated. You may need to wait a little before
>> this page is
>>        created from a template.
>>
>> Mentors
>> -------
>> Mentors should review reports for their project(s) and sign them off
>> on the
>> Incubator wiki page. Signing off reports shows that you are following the
>> project - projects that are not signed may raise alarms for the
>> Incubator PMC.
>>
>> Incubator PMC
>>
>


Re: Incubator PMC/Board report for Feb 2013 ([ppmc])

Posted by Sergio Fernández <se...@salzburgresearch.at>.
Here a first draft for the report:

--------------------
Marmotta

An open implementation of a Linked Data Platform.

Marmotta has been incubating since 2012-12-03.

Three most important issues to address in the move towards graduation:

   1. Ingest code and clear IP.
   2. A release
   3. Build dev and PMC.

Any issues that the Incubator PMC (IPMC) or ASF Board wish/need to be 
aware of?

No such issues.

How has the community developed since the last report?

* Communication mechanisms have been successfully setup: the 
dev@marmotta mailing list has quite important traffic, Jira already 
registers 50 issues, periodic meeting at IRC. This enabled the 
participation of new people in the community of the project.
* Branding (logo) almost ready. trademarks@apache already contacted.
* Awaiting for the site installation.

How has the project developed since the last report?

The project is about publish the last release of the former project 
(LMF), to them contribute the parts that will be actually Marmotta. This 
last full release already prepares some tasks for Marmotta, such as 
architectural changes and dependencies clean up. After this major 
milestone, the project's ambition is a rapid turnaround to get an Apache 
incubator release as soon as possible.

Please check this [ ] when you have filled in the report for Marmotta.

Signed-off-by:
Fabian Christ: [ ](marmotta)
Nandana Mihindukulasooriya: [ ](marmotta)
Andy Seaborne: [ ](marmotta)


Shepherd notes:

--------------------

On 30/01/13 18:11, Marvin wrote:
> Dear podling,
>
> This email was sent by an automated system on behalf of the Apache Incubator PMC.
> It is an initial reminder to give you plenty of time to prepare your quarterly
> board report.
>
> The board meeting is scheduled for Wed, 20 February 2013, 10:30:00:00 PST. The report
> for your podling will form a part of the Incubator PMC report. The Incubator PMC
> requires your report to be submitted 2 weeks before the board meeting, to allow
> sufficient time for review and submission (Wed, Feb 6th).
>
> Please submit your report with sufficient time to allow the incubator PMC, and
> subsequently board members to review and digest. Again, the very latest you
> should submit your report is 2 weeks prior to the board meeting.
>
> Thanks,
>
> The Apache Incubator PMC
>
> Submitting your Report
> ----------------------
>
> Your report should contain the following:
>
>   * Your project name
>   * A brief description of your project, which assumes no knowledge of the project
>     or necessarily of its field
>   * A list of the three most important issues to address in the move towards
>     graduation.
>   * Any issues that the Incubator PMC or ASF Board might wish/need to be aware of
>   * How has the community developed since the last report
>   * How has the project developed since the last report.
>
> This should be appended to the Incubator Wiki page at:
>
>    http://wiki.apache.org/incubator/February2013
>
> Note: This manually populated. You may need to wait a little before this page is
>        created from a template.
>
> Mentors
> -------
> Mentors should review reports for their project(s) and sign them off on the
> Incubator wiki page. Signing off reports shows that you are following the
> project - projects that are not signed may raise alarms for the Incubator PMC.
>
> Incubator PMC
>

-- 
Sergio Fernández
Salzburg Research
+43 662 2288 318
Jakob-Haringer Strasse 5/II
A-5020 Salzburg (Austria)
http://www.salzburgresearch.at