You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Tak-Lon (Stephen) Wu (Jira)" <ji...@apache.org> on 2023/02/09 16:11:00 UTC

[jira] [Resolved] (HBASE-27603) Optimize INFO message after HBASE-27498

     [ https://issues.apache.org/jira/browse/HBASE-27603?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Tak-Lon (Stephen) Wu resolved HBASE-27603.
------------------------------------------
    Resolution: Duplicate

> Optimize INFO message after HBASE-27498
> ---------------------------------------
>
>                 Key: HBASE-27603
>                 URL: https://issues.apache.org/jira/browse/HBASE-27603
>             Project: HBase
>          Issue Type: Improvement
>    Affects Versions: 2.4.16, 2.5.3
>            Reporter: Tak-Lon (Stephen) Wu
>            Assignee: Tak-Lon (Stephen) Wu
>            Priority: Major
>
> During the RC vote of 2.4.16 and 2.5.3, I found the below message should be removed or hidden from the connection operation. 
> {code}
> 2023-01-31T15:19:03,890 INFO  [main] client.ConnectionImplementation: Getting master connection state from TTL Cache
> 2023-01-31T15:19:03,891 INFO  [main] client.ConnectionImplementation: Getting master state using rpc call
> 2023-01-31T15:19:03,997 INFO  [main] client.ConnectionImplementation: Getting master connection state from TTL Cache
> 2023-01-31T15:19:03,997 INFO  [main] client.ConnectionImplementation: Getting master state using rpc call
> 2023-01-31T15:19:04,201 INFO  [main] client.ConnectionImplementation: Getting master connection state from TTL Cache
> 2023-01-31T15:19:04,202 INFO  [main] client.ConnectionImplementation: Getting master state using rpc call
> 2023-01-31T15:19:04,508 INFO  [main] client.ConnectionImplementation: Getting master connection state from TTL Cache
> 2023-01-31T15:19:04,508 INFO  [main] client.ConnectionImplementation: Getting master state using rpc call
> {code}



--
This message was sent by Atlassian Jira
(v8.20.10#820010)