[jira] [Created] (DLAB-814) [Front-end]: Ability to set/update
project quota
Dmytro Liaskovskyi created DLAB-814:
---------------------------------------
Summary: [Front-end]: Ability to set/update project quota
Key: DLAB-814
URL: https://issues.apache.org/jira/browse/DLAB-814
Project: Apache DLab
Issue Type: Task
Components: DLab Main
Reporter: Vira Vitanska
Assignee: Vira Vitanska
Fix For: v.2.2
As an Admin I want to set/update limit per project and general limit, so that I can prevent exceeding determined budget.
*Preconditions:*
Admin is logged-in DLab
Admin is located in ‘Manage environment’ popup tab on ‘Administration’ page
*Description:*
Admin is able to set/udate limit for:
Project in text box for project quota
DLab in text box for DLab for total quota
Textbox accept only numbers and only integer.
If Admin clicks ‘Apply’ button the quota is confirmed and ‘Manage environment’ popup is closed.
If Admin clicks ‘Cancel’ button the quota is not set/update and ‘Manage environment’ popup is closed.
*Acceptance criteria:*
1. Admin is able to set/update quota per project
2. Admin is able to set/update total Dlab quota
3. DLab TOTAL quota prevails (P1)
4. Project quota has second priority (P2). Such that Pr1 + Pr2 <= TOTAL Dlab
--