You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@airflow.apache.org by "Yee Ting Li (JIRA)" <ji...@apache.org> on 2017/11/29 05:59:00 UTC
[jira] [Created] (AIRFLOW-1863) should the gantt chart provide a
drop down of the dag run like the grpah view?
Yee Ting Li created AIRFLOW-1863:
------------------------------------
Summary: should the gantt chart provide a drop down of the dag run like the grpah view?
Key: AIRFLOW-1863
URL: https://issues.apache.org/jira/browse/AIRFLOW-1863
Project: Apache Airflow
Issue Type: Bug
Components: webapp
Affects Versions: 1.8.2
Reporter: Yee Ting Li
the gantt chart is a great way of displaying the efficiency of a dag run. however, the current display of the run 'time' is somewhat arbitrary and does not provide meaningful ways of determining how specific a dag performed (eg with manually triggered dags).
i think it would be useful to have a drop down of the dag runs (as it currently does with the Graph View) presented on the Gantt View.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)