You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@uima.apache.org by Tommaso Teofili <to...@gmail.com> on 2010/01/13 10:01:40 UTC

January board report

Hi,
fot the January 2010 report (today is the deadline) I collected the
following items:
* 2.3.0-RC9 is out for testing and being voted as 2.3.0-incubating * UIMA
and Semantic Search presentation at IKS 2nd workshop (see [[
http://incubator.apache.org/uima/iks09.html|here]]) * new incubating project
Clerezza planning to integrate with UIMA * New committer voted in (Bhavani
Iyer) * Fixed switching between ResourceManagers loaded with different class
loaders * Fixed script classpaths * Fixed UIMA-AS broker connection issues

I got the last three items from our Jira sorting issues by priority.
Any other suggestion is welcome :)
Cheers.
Tommaso

Re: January board report

Posted by Marshall Schor <ms...@schor.com>.

Tommaso Teofili wrote:
> 2010/1/13 Thilo Goetz <tw...@gmx.de>
>
>   
>> Hi Tommaso,
>>
>> it's a good thought, but I don't think the board is interested
>> in our progress at that level of detail.  I would leave out
>> mentioning specific issues we fixed.  My opinion, anyway.
>>     

+1  (too much detail, I agree)
>> --Thilo
>>
>>     
>
> Ok, thanks Thilo.
> I only wanted to point out our effort in putting together a clean stable
> release but you're probably right, too much detail.
> Other suggestions?
>   

I just now updated the report to add the "Items to complete before
graduation", copying the last report's message that UIMA is ready to
graduate ..., and also changed the item about RC9 to indicate that the
vote has passed.

Thanks.  -Marshall
> Cheers.
> Tommaso
>
>   

Re: January board report

Posted by Tommaso Teofili <to...@gmail.com>.
2010/1/13 Thilo Goetz <tw...@gmx.de>

>
>
> Hi Tommaso,
>
> it's a good thought, but I don't think the board is interested
> in our progress at that level of detail.  I would leave out
> mentioning specific issues we fixed.  My opinion, anyway.
>
> --Thilo
>

Ok, thanks Thilo.
I only wanted to point out our effort in putting together a clean stable
release but you're probably right, too much detail.
Other suggestions?
Cheers.
Tommaso

Re: January board report

Posted by Thilo Goetz <tw...@gmx.de>.
On 1/13/2010 10:01, Tommaso Teofili wrote:
> Hi,
> fot the January 2010 report (today is the deadline) I collected the
> following items:
> * 2.3.0-RC9 is out for testing and being voted as 2.3.0-incubating * UIMA
> and Semantic Search presentation at IKS 2nd workshop (see [[
> http://incubator.apache.org/uima/iks09.html|here]]) * new incubating project
> Clerezza planning to integrate with UIMA * New committer voted in (Bhavani
> Iyer) * Fixed switching between ResourceManagers loaded with different class
> loaders * Fixed script classpaths * Fixed UIMA-AS broker connection issues
> 
> I got the last three items from our Jira sorting issues by priority.
> Any other suggestion is welcome :)
> Cheers.
> Tommaso
> 

Hi Tommaso,

it's a good thought, but I don't think the board is interested
in our progress at that level of detail.  I would leave out
mentioning specific issues we fixed.  My opinion, anyway.

--Thilo