You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Purushottam Sinha (Jira)" <ji...@apache.org> on 2026/06/20 18:01:00 UTC

[jira] [Updated] (FLINK-39566) [runtime-web] Add checkpoint duration Gantt view

     [ https://issues.apache.org/jira/browse/FLINK-39566?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Purushottam Sinha updated FLINK-39566:
--------------------------------------
    Description: 
Problem
Today the Checkpoints tab is a wall of numbers. To find why a checkpoint was slow, you scroll through subtask rows and eyeball columns. It's hard to spot stragglers or compare checkpoints over time.         
                              
Proposal                                                                                                                                                                                                       
Add a Gantt-style view to the Checkpoints tab:
- Recent strip — last 60(or max possible if less) checkpoints as colored bars (width = duration, color = status: completed / savepoint / in-progress / failed). Auto-refreshes.                                                         
- Per-checkpoint Gantt — one row per subtask, grouped by operator, with stacked segments for the four checkpoint phases. Sorted by total duration so stragglers float to the top. Outliers and aborts highlighted.                                                                                                                                                                                                   
                              
Interactions                                                                                                                                                                                                   
- Click a bar in the strip → pins the Gantt to that checkpoint
- "Follow newest" → resume live tracking
                                                                                                                                                                                                                 
Scope                       
Frontend-only. Uses existing REST endpoints, renders via @antv/g2. No backend changes.

  was:
Problem
Today the Checkpoints tab is a wall of numbers. To find why a checkpoint was slow, you scroll through subtask rows and eyeball columns. It's hard to spot stragglers or compare checkpoints over time.         
                              
Proposal                                                                                                                                                                                                       
Add a Gantt-style view to the Checkpoints tab:
- Recent strip — last 60(or max possible if less) checkpoints as colored bars (width = duration, color = status: completed / savepoint / in-progress / failed). Auto-refreshes.                                                         
- Per-checkpoint Gantt — one row per subtask, grouped by operator, with stacked segments for the four checkpoint phases. Sorted by total duration so stragglers float to the top. Outliers and aborts highlighted.                                                                                                                                                                                                   
                              
Interactions                                                                                                                                                                                                   
- Click a bar in the strip → pins the Gantt to that checkpoint
- "Follow newest" → resume live tracking
- "Export PNG" → snapshot for incident reports
                                                                                                                                                                                                                 
Scope                       
Frontend-only. Uses existing REST endpoints, renders via @antv/g2. No backend changes.


> [runtime-web] Add checkpoint duration Gantt view
> ------------------------------------------------
>
>                 Key: FLINK-39566
>                 URL: https://issues.apache.org/jira/browse/FLINK-39566
>             Project: Flink
>          Issue Type: New Feature
>          Components: Runtime / Web Frontend
>            Reporter: Purushottam Sinha
>            Priority: Minor
>              Labels: pull-request-available
>
> Problem
> Today the Checkpoints tab is a wall of numbers. To find why a checkpoint was slow, you scroll through subtask rows and eyeball columns. It's hard to spot stragglers or compare checkpoints over time.         
>                               
> Proposal                                                                                                                                                                                                       
> Add a Gantt-style view to the Checkpoints tab:
> - Recent strip — last 60(or max possible if less) checkpoints as colored bars (width = duration, color = status: completed / savepoint / in-progress / failed). Auto-refreshes.                                                         
> - Per-checkpoint Gantt — one row per subtask, grouped by operator, with stacked segments for the four checkpoint phases. Sorted by total duration so stragglers float to the top. Outliers and aborts highlighted.                                                                                                                                                                                                   
>                               
> Interactions                                                                                                                                                                                                   
> - Click a bar in the strip → pins the Gantt to that checkpoint
> - "Follow newest" → resume live tracking
>                                                                                                                                                                                                                  
> Scope                       
> Frontend-only. Uses existing REST endpoints, renders via @antv/g2. No backend changes.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)