You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@sling.apache.org by "Carsten Ziegeler (Resolved) (JIRA)" <ji...@apache.org> on 2012/02/08 23:04:59 UTC

[jira] [Resolved] (SLING-2406) Installer start event should already be sent when resources are provisioned

     [ https://issues.apache.org/jira/browse/SLING-2406?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Carsten Ziegeler resolved SLING-2406.
-------------------------------------

    Resolution: Fixed

With revision 1242130 the events are now sent as soon as possible. In addition,
sending has been moved to the listener which takes care of sending duplicate
events.
                
> Installer start event should already be sent when resources are provisioned
> ---------------------------------------------------------------------------
>
>                 Key: SLING-2406
>                 URL: https://issues.apache.org/jira/browse/SLING-2406
>             Project: Sling
>          Issue Type: Improvement
>          Components: Installer
>    Affects Versions: Installer Core 3.3.4
>            Reporter: Carsten Ziegeler
>            Assignee: Carsten Ziegeler
>             Fix For: Installer Core 3.3.6
>
>
> Currently the installer reports started/suspended events from the run loop. When new resources arrive from a provider, the preparation of those might take some time (like copying them to the file system etc.) in this case, the started event is reported way later than the resources are provided. It would make more sense to report the started event right when new resources arrive or resources are removed

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira