You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@airflow.apache.org by "John Smodic (JIRA)" <ji...@apache.org> on 2019/07/24 18:14:00 UTC
[jira] [Closed] (AIRFLOW-5037) Execution Date is 24 hours behind
[ https://issues.apache.org/jira/browse/AIRFLOW-5037?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
John Smodic closed AIRFLOW-5037.
--------------------------------
Resolution: Not A Problem
> Execution Date is 24 hours behind
> ---------------------------------
>
> Key: AIRFLOW-5037
> URL: https://issues.apache.org/jira/browse/AIRFLOW-5037
> Project: Apache Airflow
> Issue Type: Bug
> Components: webserver
> Affects Versions: 1.10.2
> Reporter: John Smodic
> Priority: Minor
> Attachments: Selection_999(022).png, airflow.png
>
>
> For a scheduled DAG that runs every day at "0 2 * * *", the execution date as displayed is always behind.
>
> !Selection_999(022).png!
> !airflow.png!
> The tooltip doesn't seem to match (but it does for manually triggered DAGs), and even then it's showing a date that's already passed. The DAG runs fine, it just references the wrong date after the fact.
>
> The config is set to UTC and this is deployed in aws on separate webserver / scheduler nodes.
--
This message was sent by Atlassian JIRA
(v7.6.14#76016)