You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@openjpa.apache.org by "Rick Curtis (JIRA)" <ji...@apache.org> on 2010/01/11 20:37:54 UTC
[jira] Commented: (OPENJPA-250) Reduce synchronization bottlenecks
in data cache, metadata repository, and lifecycle event manager
[ https://issues.apache.org/jira/browse/OPENJPA-250?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12798817#action_12798817 ]
Rick Curtis commented on OPENJPA-250:
-------------------------------------
Committed revision 898024 to trunk. This commit comes with the same comment that I noted for the 1.2 branch.
> Reduce synchronization bottlenecks in data cache, metadata repository, and lifecycle event manager
> --------------------------------------------------------------------------------------------------
>
> Key: OPENJPA-250
> URL: https://issues.apache.org/jira/browse/OPENJPA-250
> Project: OpenJPA
> Issue Type: Improvement
> Components: build / infrastructure, datacache, jdbc, kernel, lib, query
> Affects Versions: 0.9.0, 0.9.6, 0.9.7, 1.0.3, 1.1.0, 1.2.1, 2.0.0-M2
> Reporter: Patrick Linskey
> Assignee: Rick Curtis
> Fix For: 2.0.0-M4
>
> Attachments: OPENJPA-250-1.0.x.patch, OPENJPA-250.patch, sync-121.patch
>
>
> Parts of the data cache, metadata repository, and lifecycle event manager are over-synchcronized. This should be resolved.
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.