You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Jens Deppe (JIRA)" <ji...@apache.org> on 2017/12/11 21:35:00 UTC
[jira] [Assigned] (GEODE-4073) Allow SuiteRunner to run all suite
tests each followed by a candidate test
[ https://issues.apache.org/jira/browse/GEODE-4073?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jens Deppe reassigned GEODE-4073:
---------------------------------
Assignee: Jens Deppe
> Allow SuiteRunner to run all suite tests each followed by a candidate test
> --------------------------------------------------------------------------
>
> Key: GEODE-4073
> URL: https://issues.apache.org/jira/browse/GEODE-4073
> Project: Geode
> Issue Type: Test
> Components: tests
> Reporter: Jens Deppe
> Assignee: Jens Deppe
>
> Sometimes I'm trying to track down which test has dirtied the environment for a specific test. I want to specify a set of tests and have each test be run, followed by my candidate (failing) test.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)