You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Till Rohrmann (JIRA)" <ji...@apache.org> on 2018/11/18 12:44:11 UTC
[jira] [Updated] (FLINK-9055) WebUI shows job as Running although
not enough resources are available
[ https://issues.apache.org/jira/browse/FLINK-9055?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Till Rohrmann updated FLINK-9055:
---------------------------------
Fix Version/s: 1.8.0
> WebUI shows job as Running although not enough resources are available
> ----------------------------------------------------------------------
>
> Key: FLINK-9055
> URL: https://issues.apache.org/jira/browse/FLINK-9055
> Project: Flink
> Issue Type: Bug
> Components: JobManager, Webfrontend
> Affects Versions: 1.5.0
> Environment: * FLIP-6 enabled
> * Local Flink instance with fixed number of TMs
> * Job parallelism exceeds available slots
> Reporter: Fabian Hueske
> Assignee: Sihua Zhou
> Priority: Major
> Fix For: 1.7.0, 1.8.0
>
>
> The WebUI shows a (batch) job as "Running" although not enough resources have been allocated to actually run the job with the requested parallelism.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)