You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@aurora.apache.org by "Thomas Sun (JIRA)" <ji...@apache.org> on 2015/10/26 19:38:27 UTC

[jira] [Created] (AURORA-1528) New snooze feature

Thomas Sun created AURORA-1528:
----------------------------------

             Summary: New snooze feature
                 Key: AURORA-1528
                 URL: https://issues.apache.org/jira/browse/AURORA-1528
             Project: Aurora
          Issue Type: Story
            Reporter: Thomas Sun


something that would fulfill my need would be in the next d:h:m:s(days:hours:minutes:seconds) from NOW, 
do not run(or skip running) the job even though it may be scheduled to run for x times within that time range.
if a job is scheduled to run at T0, T6, T12, T18 UTC everyday, and I did a snooze 0:8:0:0 for this job at UTC T16, then the next 2 runs(T18 today and T0 tomorrow) of the job should be skipped.
another useful interface for me would be snooze x -> x is the number of runs from NOW to skip.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)