You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@airflow.apache.org by "Siddharth Anand (JIRA)" <ji...@apache.org> on 2016/08/09 21:58:20 UTC
[jira] [Resolved] (AIRFLOW-394) Add an option to the Task Duration
graph to show cumulative times
[ https://issues.apache.org/jira/browse/AIRFLOW-394?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Siddharth Anand resolved AIRFLOW-394.
-------------------------------------
Resolution: Fixed
Issue resolved by pull request #1712
[https://github.com/apache/incubator-airflow/pull/1712]
> Add an option to the Task Duration graph to show cumulative times
> -----------------------------------------------------------------
>
> Key: AIRFLOW-394
> URL: https://issues.apache.org/jira/browse/AIRFLOW-394
> Project: Apache Airflow
> Issue Type: New Feature
> Components: webserver
> Affects Versions: Airflow 1.7.1.3
> Reporter: Siddharth Anand
> Assignee: Norman Mu
>
> Currently, the task duration graph only shows the time it takes a task instance to execute when it completes successfully. However, if a task is retried several times, the task duration chart does not currently capture the cumulative time to execute a task. With this Jira, we will introduce a new chart to graph the cumulative task duration times including both failures and retries.
> One benefit of this new chart is that it will show times for a task instance that never succeeded.
> This new chart is revealed through a checkbox option on the existing task duration chart.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)