You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hive.apache.org by "Sergio Peña (JIRA)" <ji...@apache.org> on 2015/04/13 16:54:12 UTC
[jira] [Created] (HIVE-10317) The HMS upgrade test fails when
applying patches with '-p1' instead of '-p0'
Sergio Peña created HIVE-10317:
----------------------------------
Summary: The HMS upgrade test fails when applying patches with '-p1' instead of '-p0'
Key: HIVE-10317
URL: https://issues.apache.org/jira/browse/HIVE-10317
Project: Hive
Issue Type: Bug
Reporter: Sergio Peña
Assignee: Sergio Peña
Patches uploaded to jira might be applied to the source code using 'patch -p0' or 'patch -p1' directly on the root directory of the branch.
The HMS upgrade test is using only '-p1', so some patches failed.
We need to support the '-p0' on the HMS upgrade test as well.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)