You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@datafusion.apache.org by gi...@apache.org on 2026/10/01 19:54:21 UTC
(datafusion-comet) 01/01: docs: cut the release branch before fixing regressions, and add a diagram (#6517)
This is an automated email from the ASF dual-hosted git repository.
github-merge-queue[bot] pushed a commit to branch gh-readonly-queue/main/pr-6517-75d7c7afda78cef4894dc7a183d810c7be463aa0
in repository https://gitbox.apache.org/repos/asf/datafusion-comet.git
commit 52bcd89c0572a30887224326b920b29061051d10
Author: Andy Grove <ag...@apache.org>
AuthorDate: Thu Oct 1 19:53:57 2026 +0000
docs: cut the release branch before fixing regressions, and add a diagram (#6517)
---
docs/source/_static/images/comet-release-cycle.svg | 233 +++++++++++++++++++++
docs/source/contributor-guide/release_process.md | 141 ++++++++-----
2 files changed, 326 insertions(+), 48 deletions(-)
diff --git a/docs/source/_static/images/comet-release-cycle.svg b/docs/source/_static/images/comet-release-cycle.svg
new file mode 100644
index 0000000000..ec8ff048ef
--- /dev/null
+++ b/docs/source/_static/images/comet-release-cycle.svg
@@ -0,0 +1,233 @@
+<svg xmlns="http://www.w3.org/2000/svg" viewBox="0 0 960 798" width="960" height="798" role="img" aria-labelledby="title desc">
+ <title id="title">Comet release cycle</title>
+ <desc id="desc">A Comet release takes three to four weeks. On day 0 the release branch branch-N.M is cut from main. For about a week the branch is audited for regressions, and a pull request against main is opened to fix each one. Over the next one to two weeks the fixes are reviewed, merged to main, and backported to the release branch with git cherry-pick -x. Then a release candidate is tagged and voted on; if the vote fails, the problems are fixed and the next release candidate is t [...]
+ <style>
+ svg { font-family: -apple-system, BlinkMacSystemFont, "Segoe UI", "Noto Sans", Helvetica, Arial, sans-serif; }
+ .mono, .code { font-family: ui-monospace, SFMono-Regular, "SF Mono", Menlo, Consolas, "Liberation Mono", monospace; }
+ .code { font-size: 0.92em; }
+
+ /* surfaces */
+ .canvas { fill: #fcfcfb; }
+ .band { fill: #f4f3ef; stroke: #e7e6e0; }
+ .box, .badge, .commit { fill: #ffffff; }
+ .edge { fill: none; stroke: #d9d8d1; }
+ .pill { fill: #efeee9; stroke: #dddcd5; }
+ .knock-band { fill: #f4f3ef; }
+
+ /* the release, in the OSS colour */
+ .oss { fill: #2a78d6; }
+ .oss-ring { stroke: #2a78d6; stroke-width: 2; }
+ .branch { fill: none; stroke: #2a78d6; stroke-width: 2.5; }
+ .next { fill: none; stroke: #2a78d6; stroke-width: 2; stroke-dasharray: 5 4; }
+ .backported { fill: #2a78d6; stroke: #f4f3ef; stroke-width: 2; }
+ .tag { stroke: #2a78d6; }
+
+ /* text */
+ .h1 { font-size: 22px; font-weight: 700; fill: #0b0b0b; }
+ .lede { font-size: 13.5px; fill: #52514e; }
+ .band-title { font-size: 12px; font-weight: 700; letter-spacing: 0.08em; fill: #0b0b0b; }
+ .band-sub { font-size: 12.5px; fill: #52514e; }
+ .title { font-size: 15px; font-weight: 600; fill: #0b0b0b; }
+ .badge-text { font-size: 12.5px; font-weight: 700; fill: #0b0b0b; }
+ .badge-text-sm { font-size: 11.5px; font-weight: 700; fill: #0b0b0b; }
+ .body { font-size: 13px; fill: #52514e; }
+ .submono { font-size: 12.5px; fill: #52514e; }
+ .label { font-size: 12px; fill: #52514e; }
+ .pill-text { font-size: 11.5px; font-weight: 500; fill: #52514e; }
+ .skill-text { font-size: 11.5px; fill: #52514e; }
+
+ /* lines */
+ .flow { fill: none; stroke: #77766f; stroke-width: 1.5; }
+ .trigger { stroke-dasharray: 5 4; }
+ .arrowhead { fill: #77766f; }
+ .trunk { fill: none; stroke: #77766f; stroke-width: 2.5; }
+ .commit { stroke: #77766f; stroke-width: 2; }
+ .stem { fill: none; stroke: #2a78d6; stroke-width: 1.5; }
+ .guide { fill: none; stroke: #dddcd5; stroke-width: 1; stroke-dasharray: 2 3; }
+
+ @media (prefers-color-scheme: dark) {
+ .canvas { fill: #121211; }
+ .band { fill: #1b1b1a; stroke: #2c2c2a; }
+ .box, .badge, .commit { fill: #262624; }
+ .edge { stroke: #3c3c39; }
+ .pill { fill: #31312e; stroke: #44443f; }
+ .knock-band { fill: #1b1b1a; }
+
+ .oss { fill: #3987e5; }
+ .oss-ring, .tag, .stem { stroke: #3987e5; }
+ .branch, .next { stroke: #3987e5; }
+ .backported { fill: #3987e5; stroke: #1b1b1a; }
+
+ .h1, .band-title, .title, .badge-text, .badge-text-sm { fill: #ffffff; }
+ .lede, .band-sub, .body, .submono, .label, .pill-text, .skill-text { fill: #c3c2b7; }
+
+ .flow, .trunk, .commit { stroke: #a09f98; }
+ .arrowhead { fill: #a09f98; }
+ .guide { stroke: #3c3c39; }
+ }
+ </style>
+ <defs>
+ <marker id="arrow" viewBox="0 0 10 10" refX="9" refY="5" markerWidth="6.5" markerHeight="6.5" orient="auto-start-reverse">
+ <path class="arrowhead" d="M0,0.6 L10,5 L0,9.4 Z"/>
+ </marker>
+ </defs>
+
+ <rect class="canvas" width="960" height="798" rx="16"/>
+
+ <!-- ===== Header ===== -->
+ <text x="32" y="42" class="h1">Comet release cycle</text>
+ <text x="32" y="66" class="lede">How a release moves from cutting the branch to the final release. N.M is the release in progress, for example 1.2.</text>
+
+ <!-- ===== Band 1: release cycle ===== -->
+ <rect class="band" x="16" y="88" width="928" height="442" rx="14"/>
+ <text x="36" y="114" class="band-title">RELEASE CYCLE</text>
+ <text x="36" y="132" class="band-sub">three to four weeks per release, then the next one starts</text>
+ <!-- Step 1: Cut the release branch -->
+ <g transform="translate(36,158)">
+ <rect class="box" width="272" height="130" rx="10"/>
+ <path class="oss" d="M5,1.34 A10,10 0 0 0 0,10 V120 A10,10 0 0 0 5,128.66 Z"/>
+ <rect class="edge" width="272" height="130" rx="10"/>
+ <circle class="badge oss-ring" cx="22" cy="0" r="11"/>
+ <text x="22" y="4.5" class="badge-text" text-anchor="middle">1</text>
+ <rect class="pill" x="213.47" y="-10" width="46.53" height="20" rx="10"/>
+ <text x="236.73" y="4" class="pill-text" text-anchor="middle">day 0</text>
+ <text x="16" y="34" class="title">Cut the release branch</text>
+ <text x="16" y="58" class="body">Create <tspan class="code">branch-N.M</tspan> from <tspan class="code">main</tspan></text>
+ <text x="16" y="76" class="body">Protect it; add a <tspan class="code">backport-N.M</tspan> label</text>
+ <text x="16" y="94" class="body">Version and docs PRs on the branch</text>
+ <text x="16" y="112" class="body">Bump <tspan class="code">main</tspan> to the next version</text>
+ </g>
+ <!-- Step 2: Audit for regressions -->
+ <g transform="translate(344,158)">
+ <rect class="box" width="272" height="130" rx="10"/>
+ <path class="oss" d="M5,1.34 A10,10 0 0 0 0,10 V120 A10,10 0 0 0 5,128.66 Z"/>
+ <rect class="edge" width="272" height="130" rx="10"/>
+ <circle class="badge oss-ring" cx="22" cy="0" r="11"/>
+ <text x="22" y="4.5" class="badge-text" text-anchor="middle">2</text>
+ <rect class="pill" x="170.59" y="-10" width="89.41" height="20" rx="10"/>
+ <text x="215.3" y="4" class="pill-text" text-anchor="middle">about a week</text>
+ <text x="16" y="34" class="title">Audit for regressions</text>
+ <text x="16" y="58" class="body">Benchmark against the last release</text>
+ <text x="16" y="76" class="body">Review the expression support docs</text>
+ <text x="16" y="94" class="body">Check the scheduled CI runs</text>
+ <text x="16" y="112" class="body">Open a fix PR on <tspan class="code">main</tspan> for each one</text>
+ </g>
+ <!-- Step 3: Review and backport -->
+ <g transform="translate(652,158)">
+ <rect class="box" width="272" height="130" rx="10"/>
+ <path class="oss" d="M5,1.34 A10,10 0 0 0 0,10 V120 A10,10 0 0 0 5,128.66 Z"/>
+ <rect class="edge" width="272" height="130" rx="10"/>
+ <circle class="badge oss-ring" cx="22" cy="0" r="11"/>
+ <text x="22" y="4.5" class="badge-text" text-anchor="middle">3</text>
+ <rect class="pill" x="186.62" y="-10" width="73.38" height="20" rx="10"/>
+ <text x="223.31" y="4" class="pill-text" text-anchor="middle">1–2 weeks</text>
+ <text x="16" y="34" class="title">Review and backport</text>
+ <text x="16" y="58" class="body">Get the fix PRs reviewed and merged</text>
+ <text x="16" y="76" class="body">Backport each fix to <tspan class="code">branch-N.M</tspan></text>
+ <text x="16" y="94" class="body">with <tspan class="code">git cherry-pick -x</tspan></text>
+ <text x="16" y="112" class="body">Track them with <tspan class="code">backport-N.M</tspan></text>
+ </g>
+ <!-- Step 4: Release candidate -->
+ <g transform="translate(652,342)">
+ <rect class="box" width="272" height="130" rx="10"/>
+ <path class="oss" d="M5,1.34 A10,10 0 0 0 0,10 V120 A10,10 0 0 0 5,128.66 Z"/>
+ <rect class="edge" width="272" height="130" rx="10"/>
+ <circle class="badge oss-ring" cx="22" cy="0" r="11"/>
+ <text x="22" y="4.5" class="badge-text" text-anchor="middle">4</text>
+ <rect class="pill" x="178.95" y="-10" width="81.05" height="20" rx="10"/>
+ <text x="219.48" y="4" class="pill-text" text-anchor="middle">3+ day vote</text>
+ <text x="16" y="34" class="title">Release candidate</text>
+ <text x="16" y="58" class="body">Check for missing backports</text>
+ <text x="16" y="76" class="body">Change log, full CI run</text>
+ <text x="16" y="94" class="body">Tag <tspan class="code">N.M.0-rc1</tspan>, stage Maven artifacts</text>
+ <text x="16" y="112" class="body">Start the vote on the dev list</text>
+ </g>
+ <!-- Step 5: Final release -->
+ <g transform="translate(344,342)">
+ <rect class="box" width="272" height="130" rx="10"/>
+ <path class="oss" d="M5,1.34 A10,10 0 0 0 0,10 V120 A10,10 0 0 0 5,128.66 Z"/>
+ <rect class="edge" width="272" height="130" rx="10"/>
+ <circle class="badge oss-ring" cx="22" cy="0" r="11"/>
+ <text x="22" y="4.5" class="badge-text" text-anchor="middle">5</text>
+ <rect class="pill" x="190.25" y="-10" width="69.75" height="20" rx="10"/>
+ <text x="225.12" y="4" class="pill-text" text-anchor="middle">week 3–4</text>
+ <text x="16" y="34" class="title">Final release</text>
+ <text x="16" y="58" class="body">Push the <tspan class="code">N.M.0</tspan> release tag</text>
+ <text x="16" y="76" class="body">Promote the Maven artifacts</text>
+ <text x="16" y="94" class="body">Publish the source tarball</text>
+ <text x="16" y="112" class="body">Announce the release</text>
+ </g>
+ <!-- 1 -> 2 -> 3 along the top, down to 4, back along the bottom to 5 -->
+ <path class="flow" d="M308,223 L344,223" marker-end="url(#arrow)"/>
+ <path class="flow" d="M616,223 L652,223" marker-end="url(#arrow)"/>
+ <path class="flow" d="M788,288 L788,342" marker-end="url(#arrow)"/>
+ <path class="flow" d="M652,407 L616,407" marker-end="url(#arrow)"/>
+ <!-- 5 -> 1: the next release starts right away -->
+ <path class="flow" d="M344,407 L184,407 Q172,407 172,395 L172,288" marker-end="url(#arrow)"/>
+ <text x="52" y="433" class="label">Start the next release right away:</text>
+ <text x="52" y="450" class="label">three to four weeks have passed</text>
+ <!-- vote fails: fix it and tag the next RC -->
+ <path class="flow" d="M818,472 L818,484 Q818,492 810,492 L766,492 Q758,492 758,484 L758,472" marker-end="url(#arrow)"/>
+ <text x="788" y="510" class="label" text-anchor="middle">Vote fails: fix it, tag the next RC</text>
+
+ <!-- ===== Band 2: what happens on main and the release branch ===== -->
+ <rect class="band" x="16" y="550" width="928" height="232" rx="14"/>
+ <text x="36" y="576" class="band-title">ON THE BRANCHES</text>
+ <text x="36" y="594" class="band-sub">fixes merge to main first, then are backported to the release branch</text>
+ <!-- step markers along the time axis, with guides at the step boundaries -->
+ <path class="guide" d="M170,644 V750"/>
+ <path class="guide" d="M340,644 V750"/>
+ <path class="guide" d="M620,644 V750"/>
+ <path class="guide" d="M810,644 V750"/>
+ <circle class="badge oss-ring" cx="157.96" cy="626" r="9.5"/>
+ <text x="157.96" y="630" class="badge-text-sm" text-anchor="middle">1</text>
+ <text x="173.46" y="630" class="label">cut</text>
+ <circle class="badge oss-ring" cx="237.84" cy="626" r="9.5"/>
+ <text x="237.84" y="630" class="badge-text-sm" text-anchor="middle">2</text>
+ <text x="253.34" y="630" class="label">audit</text>
+ <circle class="badge oss-ring" cx="419.38" cy="626" r="9.5"/>
+ <text x="419.38" y="630" class="badge-text-sm" text-anchor="middle">3</text>
+ <text x="434.88" y="630" class="label">review and backport</text>
+ <circle class="badge oss-ring" cx="677.66" cy="626" r="9.5"/>
+ <text x="677.66" y="630" class="badge-text-sm" text-anchor="middle">4</text>
+ <text x="693.16" y="630" class="label">RC and vote</text>
+ <circle class="badge oss-ring" cx="786.54" cy="626" r="9.5"/>
+ <text x="786.54" y="630" class="badge-text-sm" text-anchor="middle">5</text>
+ <text x="802.04" y="630" class="label">release</text>
+ <!-- main keeps moving; branch-N.M is cut from it on day 0 -->
+ <text x="36" y="676" class="submono mono">main</text>
+ <text x="36" y="742" class="submono mono">branch-N.M</text>
+ <path class="trunk" d="M84,672 H916" marker-end="url(#arrow)"/>
+ <path class="branch" d="M170,672 C170,716 182,738 214,738 H810"/>
+ <circle class="commit" cx="170" cy="672" r="5.5"/>
+ <!-- fixes merge to main, then are cherry-picked onto the release branch -->
+ <circle class="commit" cx="310" cy="672" r="5.5"/>
+ <path class="flow trigger" d="M314.51,678.61 L349.93,730.56" marker-end="url(#arrow)"/>
+ <circle class="backported" cx="355" cy="738" r="5.5"/>
+ <circle class="commit" cx="430" cy="672" r="5.5"/>
+ <path class="flow trigger" d="M434.51,678.61 L469.93,730.56" marker-end="url(#arrow)"/>
+ <circle class="backported" cx="475" cy="738" r="5.5"/>
+ <circle class="commit" cx="550" cy="672" r="5.5"/>
+ <path class="flow trigger" d="M554.51,678.61 L589.93,730.56" marker-end="url(#arrow)"/>
+ <circle class="backported" cx="595" cy="738" r="5.5"/>
+ <text x="430" y="658" class="label" text-anchor="middle">fixes merge to main first</text>
+ <text x="475" y="766" class="label" text-anchor="middle">backports (git cherry-pick -x)</text>
+ <!-- other commits on the release branch -->
+ <circle class="backported" cx="240" cy="738" r="5.5"/>
+ <text x="240" y="766" class="label" text-anchor="middle">version and docs</text>
+ <circle class="backported" cx="650" cy="738" r="5.5"/>
+ <text x="650" y="766" class="label" text-anchor="middle">change log</text>
+ <circle class="backported" cx="700" cy="738" r="5.5"/>
+ <path class="stem" d="M700,722 V732"/>
+ <rect class="pill tag" x="660.01" y="702" width="79.98" height="20" rx="10"/>
+ <text x="700" y="716" class="skill-text mono" text-anchor="middle">N.M.0-rc1</text>
+ <text x="755" y="766" class="label" text-anchor="middle">vote</text>
+ <circle class="backported" cx="810" cy="738" r="5.5"/>
+ <path class="stem" d="M810,722 V732"/>
+ <rect class="pill tag" x="784.23" y="702" width="51.55" height="20" rx="10"/>
+ <text x="810" y="716" class="skill-text mono" text-anchor="middle">N.M.0</text>
+ <!-- the next release branch is cut right away -->
+ <circle class="commit" cx="862" cy="672" r="5.5"/>
+ <path class="next" d="M862,678 C862,702 872,712 896,712" marker-end="url(#arrow)"/>
+ <text x="924" y="658" class="label" text-anchor="end">next release branch</text>
+</svg>
diff --git a/docs/source/contributor-guide/release_process.md b/docs/source/contributor-guide/release_process.md
index 575bf27f4c..9b0571bc75 100644
--- a/docs/source/contributor-guide/release_process.md
+++ b/docs/source/contributor-guide/release_process.md
@@ -23,27 +23,52 @@ This documentation explains the release process for Apache DataFusion Comet. Som
performed by any contributor, while certain release tasks can only be performed by a DataFusion Project Management
Committee (PMC) member.
+## Release Cycle
+
+Comet targets a minor release every four to six weeks (see
+[Release Cadence](../about/versioning_policy.md#release-cadence)). Each release starts by cutting the release
+branch. The weeks after that are for finding and fixing regressions on the branch, and the release candidate comes
+last.
+
+
+
+1. **Cut the release branch** from `main`. From then on, new work goes to `main` for the next release, and the
+ release branch only takes backported fixes and release mechanics such as the version bump.
+2. **Audit the release branch for regressions** for about a week, and open a pull request against `main` to fix
+ each one.
+3. **Review the fixes and backport them** to the release branch over the next one to two weeks.
+4. **Create a release candidate** and hold the vote. If the vote fails, fix the problems and create the next
+ release candidate.
+5. **Publish the release** once the vote passes.
+
+These steps take three to four weeks, so the next release starts as soon as the current one ships.
+
## Checklist
The following is a quick-reference checklist for the full release process. See the detailed sections below for
instructions on each step.
-- [ ] Release preparation: review expression support status and user guide
-- [ ] Release preparation: check the scheduled CI runs are healthy
-- [ ] Create release branch
-- [ ] Protect the release branch in `.asf.yaml`
-- [ ] Generate release documentation
-- [ ] Update Maven version in release branch
-- [ ] Update version in main for next development cycle
-- [ ] Check for fixes missing from the release branches
-- [ ] Generate the change log and PR it against the release branch
-- [ ] Run the full CI suite on the release branch
-- [ ] Build the jars
-- [ ] Tag the release candidate
-- [ ] Update documentation for the new release
-- [ ] Publish Maven artifacts to staging
-- [ ] Create the release candidate tarball
-- [ ] Start the email voting thread
+- [ ] Cut the release branch:
+ - [ ] Create the release branch and its backport label
+ - [ ] Protect the release branch in `.asf.yaml`
+ - [ ] Generate release documentation
+ - [ ] Update Maven version in release branch
+ - [ ] Update version in main for next development cycle
+- [ ] Find and fix regressions:
+ - [ ] Review expression support status and the user guide
+ - [ ] Benchmark against the previous release
+ - [ ] Check the scheduled CI runs are healthy
+ - [ ] Fix each regression on `main` and backport the fix
+- [ ] Create the release candidate:
+ - [ ] Check for fixes missing from the release branches
+ - [ ] Generate the change log and PR it against the release branch
+ - [ ] Run the full CI suite on the release branch
+ - [ ] Build the jars
+ - [ ] Tag the release candidate
+ - [ ] Update documentation for the new release
+ - [ ] Publish Maven artifacts to staging
+ - [ ] Create the release candidate tarball
+ - [ ] Start the email voting thread
- [ ] Once the vote passes:
- [ ] Publish source tarball
- [ ] Create GitHub release
@@ -55,39 +80,9 @@ instructions on each step.
- [ ] Register the release with Apache Reporter
- [ ] Delete old RCs and releases from SVN
- [ ] Write a blog post
+ - [ ] Start the next release
-## Release Preparation
-
-Before starting the release process, review the user guide to ensure it accurately reflects the current state of the
-project:
-
-- Review the [Spark Expression Support](../user-guide/latest/expressions.md) page and the supported operators list
- in the user guide. The expression page is the source of truth for expression support status, so verify that any
- expressions added or changed since the last release appear there with an accurate status (✅ / ⚠️ / 🔜 / 💤).
-- Spot-check the support status of individual expressions by running tests or queries to confirm they work as
- documented.
-- Look for any expressions that may have regressed or changed behavior since the last release and update the
- documentation accordingly.
-
-It is also recommended to run benchmarks (such as TPC-H and TPC-DS) comparing performance against the previous
-release to check for regressions. See the
-[Comet Benchmarking Guide](benchmarking.md) for instructions.
-
-Check that the scheduled CI runs have been healthy over the release window. Most of Comet's coverage of the
-non-default Spark and Iceberg versions runs nightly rather than on pull requests, so a nightly run that has been
-failing — or one that silently stopped firing — means the release is going out with less testing behind it than the
-tier table suggests. A scheduled run has no pull request to turn red, and `publish_snapshot.yml` does
-not report its own failures, so this has to be looked at deliberately. See
-[Checking that the scheduled runs are healthy](ci.md#checking-that-the-scheduled-runs-are-healthy) for the commands
-and for how to tell a genuinely quiet night from a broken one.
-
-These are tasks where agentic coding tools can be particularly helpful — for example, scanning the codebase for
-newly registered expressions and cross-referencing them against the documented list, or generating test queries to
-verify expression support status.
-
-Any issues found should be addressed before creating the release branch.
-
-## Creating the Release Candidate
+## Cutting the Release Branch
This part of the process can be performed by any committer.
@@ -211,6 +206,51 @@ Create a PR against the main branch to prepare for developing the next release:
- Update the Maven version to `0.14.0-SNAPSHOT` in the same set of files listed above (the `pom.xml` files,
the Spark test diffs under `dev/diffs`, and the Iceberg test diffs under `dev/diffs/iceberg`).
+## Finding and Fixing Regressions
+
+Once the release branch is cut, spend about a week auditing it for regressions, then one to two weeks getting the
+fixes reviewed and backported. Anyone can help with both.
+
+### Audit the Release Branch
+
+Check that the user guide accurately reflects what is being released:
+
+- Review the [Spark Expression Support](../user-guide/latest/expressions.md) page and the supported operators list
+ in the user guide. The expression page is the source of truth for expression support status, so verify that any
+ expressions added or changed since the last release appear there with an accurate status (✅ / ⚠️ / 🔜 / 💤).
+- Spot-check the support status of individual expressions by running tests or queries to confirm they work as
+ documented.
+- Look for any expressions that may have regressed or changed behavior since the last release and update the
+ documentation accordingly.
+
+Run benchmarks (such as TPC-H and TPC-DS) on the release branch and compare them against the previous release to
+check for performance regressions. See the [Comet Benchmarking Guide](benchmarking.md) for instructions.
+
+Check that the scheduled CI runs have been healthy over the release window. Most of Comet's coverage of the
+non-default Spark and Iceberg versions runs nightly rather than on pull requests, so a nightly run that has been
+failing — or one that silently stopped firing — means the release is going out with less testing behind it than the
+tier table suggests. A scheduled run has no pull request to turn red, and `publish_snapshot.yml` does
+not report its own failures, so this has to be looked at deliberately. See
+[Checking that the scheduled runs are healthy](ci.md#checking-that-the-scheduled-runs-are-healthy) for the commands
+and for how to tell a genuinely quiet night from a broken one.
+
+These are tasks where agentic coding tools can be particularly helpful — for example, scanning the codebase for
+newly registered expressions and cross-referencing them against the documented list, or generating test queries to
+verify expression support status.
+
+### Fix and Backport Regressions
+
+File an issue for each regression and open a pull request against `main` that fixes it. Committers add the
+`backport-0.13` label to these pull requests, and once each one merges it is backported to the release branch as
+described in [Backporting to Release Branches](backporting.md). The label shows which fixes still need to reach the
+branch.
+
+Create the release candidate once the fixes have been backported.
+
+## Creating the Release Candidate
+
+This part of the process can be performed by any committer.
+
### Check for Missing Backports
Before generating the change log, check that the new branch has every fix from the older release branches that are
@@ -601,3 +641,8 @@ Writing a blog post about the release is a great way to generate more interest i
Google document where the community can collaborate on a blog post. Once the content is agreed then a PR can be
created against the [datafusion-site](https://github.com/apache/datafusion-site) repository to add the blog post. Any
contributor can drive this process.
+
+### Start the Next Release
+
+The release cycle takes three to four weeks, so start the next release right away by cutting its release branch.
+See [Release Cycle](#release-cycle).
---------------------------------------------------------------------
To unsubscribe, e-mail: commits-unsubscribe@datafusion.apache.org
For additional commands, e-mail: commits-help@datafusion.apache.org