You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Zhu Zhu (Jira)" <ji...@apache.org> on 2022/07/22 08:04:00 UTC
[jira] [Closed] (FLINK-28138) Add metrics for speculative execution
[ https://issues.apache.org/jira/browse/FLINK-28138?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Zhu Zhu closed FLINK-28138.
---------------------------
Resolution: Done
Done via
2173b45b570de8ff1507b8e29a884e2449ffea62
19b0a95c30afd9ed65252c49fb00cef882412553
> Add metrics for speculative execution
> -------------------------------------
>
> Key: FLINK-28138
> URL: https://issues.apache.org/jira/browse/FLINK-28138
> Project: Flink
> Issue Type: Sub-task
> Components: Documentation
> Reporter: Zhu Zhu
> Assignee: Zhu Zhu
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.16.0
>
>
> Following two metrics will be added to expose job problems and show the effectiveness of speculative execution:
> # {*}numSlowExecutionVertices{*}: Number of slow execution vertices at the moment.
> # {*}numEffectiveSpeculativeExecutions{*}: Number of speculative executions which finish before their corresponding original executions finish.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)