You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-dev@hadoop.apache.org by "Tao Jie (JIRA)" <ji...@apache.org> on 2017/02/23 06:32:44 UTC
[jira] [Created] (YARN-6224) Should consider utilization of each
ResourceType on node while scheduling
Tao Jie created YARN-6224:
-----------------------------
Summary: Should consider utilization of each ResourceType on node while scheduling
Key: YARN-6224
URL: https://issues.apache.org/jira/browse/YARN-6224
Project: Hadoop YARN
Issue Type: Sub-task
Reporter: Tao Jie
In situation like YARN-6101, if we consider all type of resource(vcore, memory) utilization on node rather than just answer we can allocate or not, we are more likely to have better resource utilization as a whole.
It is possible that we have a set of candidate nodes, then find the most promising node to assign to one request considering node resource utilization with global scheduling.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)
---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-dev-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-dev-help@hadoop.apache.org