You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Huaxiang Sun (Jira)" <ji...@apache.org> on 2020/05/04 23:38:00 UTC
[jira] [Created] (HBASE-24323) Avoid two parallel running of
GCMulitpleMergedRegionsProcedure over the same region.
Huaxiang Sun created HBASE-24323:
------------------------------------
Summary: Avoid two parallel running of GCMulitpleMergedRegionsProcedure over the same region.
Key: HBASE-24323
URL: https://issues.apache.org/jira/browse/HBASE-24323
Project: HBase
Issue Type: Bug
Reporter: Huaxiang Sun
As [~stack]Â suggested in one of PRs, "This method is called from GCMergedRegionsProcedure and GCMulitpleMergedRegionsProcedure. I was wondering if we took a lock on the Region being Merged would it stop two overlapping GCs happening?"
--
This message was sent by Atlassian Jira
(v8.3.4#803005)