You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@kylin.apache.org by mvneethu <ne...@tigeranalytics.com> on 2018/08/13 07:54:41 UTC
Kylin 2.3.2 - Job Status is not getting updated even after the
progress is 100 %
Hi,
I am using kylin 2.3.2 and I see that kylin does not update the status even
after the progress is 100%. Is this a bug or something else? The job runs
continuously until I drop it. The results are saved to HBASE and I am able
to query it. Please clarify.
--
Sent from: http://apache-kylin.74782.x6.nabble.com/
Re: Kylin 2.3.2 - Job Status is not getting updated even after the
progress is 100 %
Posted by Li Yang <li...@apache.org>.
The behavior described is certainly not expected. Did you analyze kylin.log
and see anything suspicious?
Yang
On Mon, Aug 13, 2018 at 8:54 AM mvneethu <ne...@tigeranalytics.com>
wrote:
> Hi,
>
> I am using kylin 2.3.2 and I see that kylin does not update the status even
> after the progress is 100%. Is this a bug or something else? The job runs
> continuously until I drop it. The results are saved to HBASE and I am able
> to query it. Please clarify.
>
> --
> Sent from: http://apache-kylin.74782.x6.nabble.com/
>