You are viewing a plain text version of this content. The canonical link for it is here.
Posted to stonehenge-dev@incubator.apache.org by "Andrew (Drew) (JIRA)" <ji...@apache.org> on 2009/04/17 13:30:22 UTC
[jira] Assigned: (STONEHENGE-18) Run the Release Audit Tool (RAT)
on codebase in prep for M2
[ https://issues.apache.org/jira/browse/STONEHENGE-18?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andrew (Drew) reassigned STONEHENGE-18:
---------------------------------------
Assignee: Andrew (Drew)
> Run the Release Audit Tool (RAT) on codebase in prep for M2
> -----------------------------------------------------------
>
> Key: STONEHENGE-18
> URL: https://issues.apache.org/jira/browse/STONEHENGE-18
> Project: Stonehenge
> Issue Type: Task
> Reporter: Abu Obeida Bakhach
> Assignee: Andrew (Drew)
> Priority: Critical
> Fix For: M1
>
> Original Estimate: 48h
> Remaining Estimate: 48h
>
> We need the scan the code (all the code) by the RAT tool to ensure that it is ready for release
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.