You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "rajeshbabu (JIRA)" <ji...@apache.org> on 2013/04/08 20:51:16 UTC
[jira] [Created] (HBASE-8295)
TestMasterFailover.testMasterFailoverWithMockedRITOnDeadRS is flaky.
rajeshbabu created HBASE-8295:
---------------------------------
Summary: TestMasterFailover.testMasterFailoverWithMockedRITOnDeadRS is flaky.
Key: HBASE-8295
URL: https://issues.apache.org/jira/browse/HBASE-8295
Project: HBase
Issue Type: Bug
Affects Versions: 0.95.0
Reporter: rajeshbabu
Assignee: rajeshbabu
Fix For: 0.98.0, 0.95.1
TestMasterFailover.testMasterFailoverWithMockedRITOnDeadRS failed because asserting before finishing SSH process of dead server.
https://builds.apache.org/job/PreCommit-HBASE-Build/5182//artifact/trunk/hbase-server/target/surefire-reports/org.apache.hadoop.hbase.master.TestMasterFailover.txt
In SSH Checked how many regions carrying by dead server but not started assignment before asserting.
{code}
2013-04-08 12:17:18,238 INFO [MASTER_SERVER_OPERATIONS-asf001.sp2.ygridcore.net,41490,1365423432616-1] handler.ServerShutdownHandler(192): Reassigning 14 region(s) that asf001.sp2.ygridcore.net,46030,1365423422112 was carrying (and 0 regions(s) that were opening on this server)
{code}
We need to wait until SSH processing finished to ensure atleast regions assignment started. After that we will any way wait at blockUntilNoRIT until assignment completed.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira