You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@continuum.apache.org by "Wendy Smoak (JIRA)" <ji...@codehaus.org> on 2008/08/04 21:44:26 UTC

[jira] Commented: (CONTINUUM-1421) Add an admin task to stop properly Continuum

    [ http://jira.codehaus.org/browse/CONTINUUM-1421?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=144088#action_144088 ] 

Wendy Smoak commented on CONTINUUM-1421:
----------------------------------------

This is definitely necessary, and should be available in some way that supports scripting.

It needs to stop accepting requests, stop scheduling things, and shut down once the queues are empty.  

There should be a (configurable) timeout so that it doesn't wait forever.  (Maybe you're trying to shut down because a build is stuck and will never finish.)

> Add an admin task to stop properly Continuum
> --------------------------------------------
>
>                 Key: CONTINUUM-1421
>                 URL: http://jira.codehaus.org/browse/CONTINUUM-1421
>             Project: Continuum
>          Issue Type: Improvement
>          Components: Core system
>            Reporter: Emmanuel Venisse
>            Assignee: Olivier Lamy
>             Fix For: 1.3
>
>
> When a project is building and an admin stop continuum, the actual build result is never marked as stopped.
> A possible solution would be to planned a shutdown in the web interface via a form. With this action, all sheduler will be stopped and a message will be sent to the admin (page after the submit in the shutdown form). With this message, the admin will know that he can shutdown Continuum properly without non ended build process.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira