You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@ignite.apache.org by "Amelchev Nikita (JIRA)" <ji...@apache.org> on 2018/10/31 12:30:00 UTC
[jira] [Created] (IGNITE-10087)
IgniteClientReconnectMassiveShutdownTest.testMassiveServersShutdown1 is
flaky in master
Amelchev Nikita created IGNITE-10087:
----------------------------------------
Summary: IgniteClientReconnectMassiveShutdownTest.testMassiveServersShutdown1 is flaky in master
Key: IGNITE-10087
URL: https://issues.apache.org/jira/browse/IGNITE-10087
Project: Ignite
Issue Type: Bug
Reporter: Amelchev Nikita
Assignee: Amelchev Nikita
Fix For: 2.8
The IgniteClientReconnectMassiveShutdownTest.testMassiveServersShutdown1 test is flaky in master. Sometimes the test fails on test timeout (5 min).
[Test history.|https://ci.ignite.apache.org/project.html?projectId=IgniteTests24Java8&testNameId=-6728945354254258306&branch=<default>&tab=testDetails]
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)