You are viewing a plain text version of this content. The canonical link for it is here.
Posted to mapreduce-issues@hadoop.apache.org by "Hadoop QA (JIRA)" <ji...@apache.org> on 2015/05/02 06:43:18 UTC
[jira] [Commented] (MAPREDUCE-4711) Append time elapsed since
job-start-time for finished tasks
[ https://issues.apache.org/jira/browse/MAPREDUCE-4711?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14524850#comment-14524850 ]
Hadoop QA commented on MAPREDUCE-4711:
--------------------------------------
\\
\\
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:red}-1{color} | patch | 0m 0s | The patch command could not apply the patch during dryrun. |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | http://issues.apache.org/jira/secure/attachment/12548038/MAPREDUCE-4711.branch-0.23.patch |
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / f1a152c |
| Console output | https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/5553/console |
This message was automatically generated.
> Append time elapsed since job-start-time for finished tasks
> -----------------------------------------------------------
>
> Key: MAPREDUCE-4711
> URL: https://issues.apache.org/jira/browse/MAPREDUCE-4711
> Project: Hadoop Map/Reduce
> Issue Type: Bug
> Components: jobhistoryserver
> Affects Versions: 0.23.3
> Reporter: Ravi Prakash
> Attachments: MAPREDUCE-4711.branch-0.23.patch
>
>
> In 0.20.x/1.x, the analyze job link gave this information
> bq. The last Map task task_<sometask> finished at (relative to the Job launch time): 5/10 20:23:10 (1hrs, 27mins, 54sec)
> The time it took for the last task to finish needs to be calculated mentally in 0.23. I believe we should print it next to the finish time.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)