You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@ambari.apache.org by "Jonathan Hurley (JIRA)" <ji...@apache.org> on 2015/05/28 18:13:18 UTC
[jira] [Resolved] (AMBARI-11487) Changed Configurations During
Upgrade Are Reverted During Finalize
[ https://issues.apache.org/jira/browse/AMBARI-11487?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jonathan Hurley resolved AMBARI-11487.
--------------------------------------
Resolution: Fixed
> Changed Configurations During Upgrade Are Reverted During Finalize
> ------------------------------------------------------------------
>
> Key: AMBARI-11487
> URL: https://issues.apache.org/jira/browse/AMBARI-11487
> Project: Ambari
> Issue Type: Bug
> Components: ambari-server
> Affects Versions: 2.1.0
> Reporter: Jonathan Hurley
> Assignee: Jonathan Hurley
> Priority: Blocker
> Fix For: 2.1.0
>
>
> During a rolling upgrade from HDP 2.2 to HDP 2.3, several components such as MapR and Storm have their new HDP 2.3 configurations updated with {{ConfigureTask}} changes from the upgrade pack.
> The database reflects the correct changes up until {{FinalizeUpgradeAction}} is invoked, after which the original HDP 2.3 values are re-inserted.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)