You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Joep Rottinghuis (JIRA)" <ji...@apache.org> on 2016/07/11 17:21:15 UTC

[jira] [Updated] (YARN-4069) For long running apps (> 2 days), populate flow activity table

     [ https://issues.apache.org/jira/browse/YARN-4069?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Joep Rottinghuis updated YARN-4069:
-----------------------------------
    Labels: YARN-5355  (was: )

> For long running apps (> 2 days), populate flow activity table
> --------------------------------------------------------------
>
>                 Key: YARN-4069
>                 URL: https://issues.apache.org/jira/browse/YARN-4069
>             Project: Hadoop YARN
>          Issue Type: Sub-task
>          Components: timelineserver
>            Reporter: Vrushali C
>            Assignee: Varun Saxena
>              Labels: YARN-5355
>
> YARN-4063 / YARN-3901 contain the work being done to populate the flow activity and flow run tables.
> The flow activity table is updated each time a yarn application is created and finishes. So if an application runs for more than 3 days, day1 has an entry for the flow for start time, day3 has an entry for the flow for end time but day2 has no entry for that flow. 
> Filing the jira to ensure that for long running apps, the flow activity table does get a snapshot time entered for each day that an application is running in that flow.
> It may be the case that for ALL apps (long running or not) the same update may be done in the flow activity table.



--